挖孔桩施工组织(Excavation pile; construction; organization).docVIP

  • 3
  • 0
  • 约1.89万字
  • 约 15页
  • 2017-10-07 发布于河南
  • 举报

挖孔桩施工组织(Excavation pile; construction; organization).doc

挖孔桩施工组织(Excavation pile; construction; organization)

挖孔桩施工组织(Excavation pile; construction; organization) Construction scheme of artificial dig hole pile I. General Situation of the project Describe this yourself Two 、 engineering geology and hydrogeological condition Look at the geological report above Two. Construction preparation: 2.1 materials and main equipment: 2.1.1 cement: 325 ~ 425 ordinary portland cement should be adopted 2.1.2 sand: local river sand, mud content is not greater than 5%. 2.1.3 stone: the size of the retaining wall is 0.5 ~ 1.5cm melon seeds; the core concrete of the pile is made of 2 ~ 3cm gravel. 2.1.4 water: drinking tap water. 2.1.5 plus early strength agent shall be selected by test, and fly ash admixture shall be determined according to the test room. 2.1.6 reinforcement: the grade and diameter of reinforcing steel conform to the design requirements. There are factory certificate and re examination report. 2.1.7 should normally have a winch, Sanmu unit or electric hoist, trolley or dump trucks, pick and shovel, hand shovel, drill, line sinkers, fixed pulley block, a guide pulley group, concrete mixer, bucket, chute, conduit, vibrators, drilling, wire rope, safety rope, thick plate waterproof lamp (low pressure, 36V, 100W), electric welder, ventilation and oxygen supply equipment, lift pump, concrete pump, 60 wooden windlass, activity ladder, safety helmets, safety belts etc.. 2.1.8 template: assembled steel mould, arc tool type steel mould four pieces (or eight pieces) assemble. Fixture, hook and spare parts. Board, wood, square, etc. 2.2 operating conditions: 2.2.1 artificial excavation of pile holes, shaft lining support should be based on geological survey of soil characteristics, groundwater distribution, reasonable division of labor and special matters needing attention. 2.2.2 excavation, the site should be completed three through a flat. The ground, underground cables, pipelines, old buildings, equipment and other obstacles have been eliminated. All temporary facilities, such as l

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档