网站大量收购独家精品文档,联系QQ:2885784924

新建房屋的接管验收应提交的资料(Documents to be submitted for acceptance of new buildings).doc

新建房屋的接管验收应提交的资料(Documents to be submitted for acceptance of new buildings).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新建房屋的接管验收应提交的资料(Documents to be submitted for acceptance of new buildings)

新建房屋的接管验收应提交的资料(Documents to be submitted for acceptance of new buildings) Information to be submitted for acceptance of the new buildings.Txt Documents to be submitted for acceptance of new buildings The Ministry of construction of the housing takeover acceptance standards provisions, the new housing over inspection shall submit the following information: (1) property of the approval documents of the project; land use approval; building license; relocation information. (2) technical data: a full set of drawings drawings -- including general layout, architecture, structure, equipment, pipeline and ancillary works; geological survey report; project contract and the start and completion report; final accounts of engineering drawings; records; engineering design change notice and technology approved list (including records quality accident treatment); acceptance of concealed work visa; settlement observation; final acceptance certificate; the quality of steel and cement and other main materials guarantee; new materials, the identification certificate of accessories; certificate of inspection of water and electricity, heating and sanitary appliances, elevator equipment; block pressure test report of mortar, concrete, water supply; heating pressure test report. Provisions for the completion acceptance of real estate development projects Acceptance is the last procedure operation process of real estate development project, is an important part of a comprehensive assessment of the construction work, check whether it meets the design requirements and the quality of the project, but also the key to ensure the quality of the real estate development project. Urban real estate management law, twenty-sixth and 2 paragraph: real estate development projects completed, subject to acceptance before delivery. The provisions of the Interim Measures of city real estate development management, real estate development project is completed, the real estate development enterprises shall ap

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档