家装施工工艺大全(Home improvement construction process Daquan).docVIP

  • 2
  • 0
  • 约1.45万字
  • 约 12页
  • 2017-10-06 发布于河南
  • 举报

家装施工工艺大全(Home improvement construction process Daquan).doc

家装施工工艺大全(Home improvement construction process Daquan)

家装施工工艺大全(Home improvement construction process Daquan) The first: start work before the start of the work done 1, whether the ground wall percussion hollowing, such as hollowing require developers to eradicate the redo; 2, kitchen, bathroom, balcony, balcony do closed water test, such as leakage, to urge developers to rectify; 3. Connect the hot and cold water pipe, open the main valve and open the plug one by one to see if the water is through; 4, protect all finished products (such as anti-theft door, visual telephone, doorbell, finished kitchen, gas meter, etc.) protection; 5, carefully check whether the strong and weak circuit patency, floor drain, the water is smooth; 6, carefully check whether the wall beam column askew, and so on. Second: remodeling wall technology 1, first with the cutting machine need to remove part of the cutting out again, do not use a sledgehammer, lest too much vibration affects the removal of the wall; 2, first with a small hammer drill the bottom up and then slowly emptied. The door to dig new door lintel; 3, do not hit parts: load-bearing walls, concrete walls. Third: water production process 1, the hot and cold water pipe is embedded in the wall depth, the distance between the pipe wall and the wall epidermis should be 1cm, and strictly follow the principle of left hot right cold; 2, the outlet must be in strict accordance with national standards, leading spacing, size arrangement, internal and external silk to distinguish; 3, no blockage, connect hot and cold water pipe pressure test pump, pressure 0.8MPa above, no explosion, take, drop, leakage. No sealing wall can be blocked without pressurization test; 4, after tiling, hot and cold water faucet elbow can not highlight the brick surface; 5, after water pressure test, open the main valve and open the plug one by one to see if the connection is blocked; 6, draw accurate water pipe line, to the owner to save (preferably under the construction part of the photos to save). Fourth: ele

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档