- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑弱电工程师习题(Building weak engineer problem)
建筑弱电工程师习题(Building weak engineer problem)
First, individual choice questions
1, Chinas intelligent building design standards that year promulgated (C).
A, 1984 B, 1994 C, 2000 D, 2002
2, building automation system referred to as (C).
A, FAS, B, CAS, C, BAS, D, SAS
3, automatic detection technology, which is the detection of non electric energy into electricity detection (D).
A, power factor B, voltage C, current D, speed
4, the intelligent building site controller adopts computer technology, also known as direct digital controller, referred to as (B)
A, DVD, B, DDC, C, DSP, D, DCE
5, the control function is dispersed, and the operation management is centralized, so it is called decentralized control system, referred to as distributed control system, and its English alphabet is (A)
A, DCS, B, DCE, C, DCP, D, DSS
6 、 in the building automation control system, the widely used executing agency is (C)
A, pneumatic actuator B, hydraulic actuator C, electric actuator D, hybrid actuator
7, cold ice machine outlet water temperature is generally (B)
A, 00C, B, 70C, C, 120C, D, 200C
8 、 independent coil control with three speed switch temperature control (C)
A, 200C to 250C, B, 00C to 250C, C, 50C to 300C, D, 50C to 250C
9. The DC operating voltage of the fire fighting linkage equipment shall comply with the GB156 regulations, and priority shall be adopted (C)
A, AC18V, B, DC18V, C, DC24V, D, AC24V
10 、 the DC equipment of fire fighting linkage equipment should send out the linkage control signal within (B) time after receiving the fire alarm signal.
A, 1S, B, 3S, C, 1min, D, 10min
11, automatic alarm button and the location of fire hydrants shall not exceed in each fire district (C)
A, 10M, B, 15M, C, 30M, D, 35M
12, the intrusion detector has a strong anti-interference ability, and for the beam axis (C) or greater than any of the external light source interference signal, should not produce false positives.
A, 5 degrees B, 10 degrees C, 15 degrees D, 20 degrees
13, as the tr
您可能关注的文档
- 就李昌奎案与车浩博士再商榷(Discuss Dr. Li Changkui's case with Dr. Hao Hao).doc
- 就业指导考试部分问题答案(Part of the questions about the employment guidance test).doc
- 尼龙(nylon).doc
- 局域网ping不通原因(Lan Ping blocked reason).doc
- 局域网ping不通的原因(The reason why Lan Ping is blocked).doc
- 尚丰五步棋打造金牌营销团队(Shang Feng five moves to create the gold marketing team).doc
- 局域网不能访问共享问题(LAN does not access shared problems).doc
- 尼龙简介及特性(Introduction and characteristics of nylon).doc
- 尽显华夏风景教你风光摄影拍摄技巧(Show Chinese scenery, teach you scenery photography skills).doc
- 局域网共享问题全方位解决(LAN sharing problem, a comprehensive solution).doc
原创力文档


文档评论(0)