HAZID技术要求与执行要素.docx

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HAZID技术要求与执行要素

EPCIC OF WELLHEAD PLATFORMS, ASSOCIATEDPIPELINES AND TIE-INSOFZAWTIKA DEVELOPMENT PROJECT PHASE 1BHAZID Terms of ReferenceA121-jun-14Issued for ReviewREVDATEBYDESCRIPTIONCHECKAPPR.CHECKAPPR.ENGINEERING APPROVALCOMPANY APPROVALREVISION CODE: A = Issued for Review – B = Issued for Approval – C = Approved for Design or Approved for Construction or Issued for Implementation or Issued for Purchase or Issued for Purchase SpecificationTOTAL OR PARTIAL AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNERPTTEP INTERNATIONAL LIMITEDEPCIC OF ZAWTIKA DEVELOPMENT PROJECT PHASE 1BREVA11 项目概述1.1 GeneralThe Zawtika Project is a gas field development project located in the Gulf of Martaban, Myanmar. The development area covers Block M9 and small portion of Block M11, owned by Myanmar Oil Gas Enterprise (MOGE). The field lies approximately 300 km south of Yangon and 290 km west of Tavoy on the Myanmar coast and the average water depth is approximately 140-150 meters.Figure 1.1: Zawtika Field LocationZawtika field development is planned in three phases 1A (existing facilities), 1B and 1C as per Figure 1.2 Zawtika Field Layout. Phase 1A development consisting of Zawtika Processing integrated with living quarter platform (ZPQ), WP1, WP2, and WP3 is currently being developed. Commercial production is expected to commence in the first quarter of 2014. Phase 1B and 1C (remote wellhead platforms) will be developed in order to sustain production plateau through the field life.Figure 1.2:Zawtika Field Layout1.2 ObjectivesThe intent of the HAZOP review is to systematically review the design andoperations of the WP4/5/7 and WP4facilities andBrown Field modifications of existing platforms ZPQ, WP2, and WP3to identify any safety andoperability problems associated with the processes.The risk management objectives of the HAZOP Review are to:Identify safety related hazards and operability concerns related to theprocess;Determine the consequenc

文档评论(0)

2017ll + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档