- 1、本文档共44页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HPHTTestingGuidelines-斯伦贝谢
I N D E X
1. Introduction
2. Design Specification
2.1 Proposed Equipment Layout
- Layout Drawing
2.2 Process and Instrumentation Details
- PID Drawing
- Process Line Data Sheet
- Instrument Data Sheet
- Equipment Data Sheet
2.3 Equipment Pressure Temperature Rating
- Equipment Pressure Temperature rating
2.4 Safety Systems - Details
- SAFE Chart
- Safety System Philosophy
- Safety Analysis Tables
2.5 System Throughput Calculations
- System Throughput Recap
- System Throughput Details calculations
2.6 PSV’s Pressure Drop Calculations
- PSV Sizing Recap
- PSV Pressure Drop Details calculations
2.7 Landing String Design
- Subsea Equipment Drawing
- Subsea X-Over listing
3. Technical Specification
Surface equipment data sheets
Subsea equipment data sheets
4. Recommended Operating Procedures
4.1 Equipment Preparation
4.2 Rig Up of Surface Equipment
4.2.1 Pipework Procedures
4.2.1.1 WECO Type Pipework (Lipseal type)
4.2.1.2 WECO Type Pipework (O-Ring type)
4.2.1.3 Flange Type Pipework (Raised face type)
4.2.1.4 Flange Type Pipework (Ring Groove type)
4.2.1.5 Techlok Clamp Type Pipework
4.2.2 Pressure Testing Procedures
4.3 Guidelines for Equipment Operations
4.3.1 Explosive Decompression.
4.3.2 EZ Valve Operations
4.3.3 Choke Manifold Operations
4.3.3.1 Well start up through choke manifold
4.3.3.2 Changing from adjustable choke to fixed choke
4.3.4 Heat Exchanger Operations
4.3.4.1 Well start up
4.3.4.2 Passing the flow through the Heat exchanger coil
4.3.4.3 Directing of steam supply to vessel
4.3.5 Separator Operations
4.3.5.1 Well start up through separator bypass
4.3.5.2 Directing of well through separator
4.3.5.3 Bypassing of well from separator
4.3.6 Burner Operations
4.3.6.1 Start up procedures for operation of burners
4.3.6.2 Procedures for changing over booms
4.3.6.3 Burner shutdown.
4.3.7 Oil Manifold Operations
5. DST Downhole Test Tools
Proposed DST String
DST Equipment Technical data sheets
6. TCP Tubing Conveyed Perforating
Propos
您可能关注的文档
- 2上海市新型建设工程材料(新型墙体材料)认定申请表.doc
- 2、货币政策目标 .ppt
- 2北京财智财富资产管理中心(有限合伙)合伙份额确认书.doc
- 2吨燃煤锅炉与天燃气锅炉费用对照表.doc
- 2伺服控制器的初始化设置.ppt
- 27河中石兽课件.ppt
- 2广东省交通建设工程现场检测和工程材料试(检)验收费标准表(新增51.doc
- 2徐邦桃-加强学科教研组建设积极实施有效校本教研【青岛2011810】.ppt
- 2抛物线(二次函数)中的直角三角形.doc
- 2晶闸管的结构和工作原理.ppt
- wipo-2022年技术与创新支持中心和技术转让办公室报告 - 加强地方创新能力以加速知识和技术转让.docx
- 中文大模型基准测评2024年10月报告-2024年度中文大模型阶段性进展评估.docx
- 2024年三季度宏观经济分析报告.docx
- 【深交所】红日药业:2024年一季度报告.docx
- Acc智能制造与卓越运营业务体系设计咨询方案.docx
- 第六代固定通信网(F6G)白皮书V2.0——天地一体化光通信技术.docx
- 提升效益 持盈保泰-摩根大通2024年中国运营资金指数报告-摩根大通.docx
- 新时代低空休闲发展研究-中国旅游协会休闲度假分会.docx
- 标普信评 -保障房怎么搞?--新加坡模式的借鉴与启发 202409.docx
- 标普信评 -一文看懂电力行业信用趋势:风光发电杠杆或持续上升 202409.docx
文档评论(0)