异形独塔斜拉桥张拉顺序研究.pdfVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
异形独塔斜拉桥张拉顺序研究

Hans Journal of Civil Engineering 土木工程, 2016, 5(5), 222-232 Published Online September 2016 in Hans. /journal/hjce /10.12677/hjce.2016.55030 Study on Tensioning Sequence of Cable for Abnormal Single Pylon Cable Stayed Bridge 1 2* 2 1 1 1 1 Xiangdong Liao , Jun Hu , Yi Luo , Fuyuan Guo , Jie Zhang , Biru Wang , Qunying Tao , Chuan Zeng1 1 China Construction Third Engineering Bureau Steel Structure Company, Wuhan Hubei 2 School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan Hubei th th th Received: Sep. 8 , 2016; accepted: Sep. 25 , 2016; published: Sep. 28 , 2016 Copyright © 2016 by authors and Hans Publishers Inc. This work is licensed under the Creative Commons Attribution International License (CC BY). /licenses/by/4.0/ Open Access Abstract The tension sequence problem of the abnormal cable stayed bridge is very complicated. As cable stayed bridges are highly statically redundant structures, the structure systems are constantly changing with the construction process and the tension of the cable will affect the stress state of the structure. And it is important to determine the tension time of the back cable in the cable stayed bridge. In this paper, we make a construction stages analysis of different tension schemes, and com- pare various solutions by the parameters of the stress state of the bridge, like the stress of the ca- ble, main girder and the main tower stress and deformation and so on. At last, we get the optimal cable tension schemes, which will provide guidance for the construction process and be time saving.

文档评论(0)

wyw118 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档