2011年北京阳光校园金太阳工程建设项目.doc

2011年北京阳光校园金太阳工程建设项目.doc

  1. 1、本文档共70页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2011年北京阳光校园金太阳工程建设项目

Beijing Rooftop Solar PV Scale-up Project Environmental Management Plan (Updated for Restructuring) Owner Company: Beijing YuanShen Energy-saving technology Co., Ltd EIA Company: Energy and Environmental Development Engineering Limited June 2017, Beijing Content 1 General Information 1 1.1 Background 1 1.2 Objective of the environmental management plan 3 1.3 Technical details for authorization 4 2 Environmental management institution, Framework of law and Safeguard policy in WB 5 2.1 Environmental management institution 5 2.2 Legal and regulatory framework 5 2.2.1 Environmental laws and regulations 5 2.2.2 Environmental impact assessment of technical guidelines and specifications 6 2.3 Environmental standards 6 2.3.1 Environmental quality standards 6 2.3.2 Pollutant emission standards 6 2.4 Word Bank security policy 7 3 Description of subproject 8 3.1 Subproject objective 8 3.2 Subproject overview 8 3.2.1 Location and relation with surrounding 9 3.2.2 Construction scale and content 9 3.2.3 Construction program 11 3.3 Project adjustment plan 12 3.3.1 Education fields 14 3.3.2 Key fields 16 3.3.3 Public frustration 17 3.3.4 key energy consuming units 20 4 Environmental screening and management program 22 4.2 environmental screening and management program after midterm adjustment 25 5 Environmental management plan organization 31 5.1 Project owner 31 5.2 Contractor and environmental staff 32 5.3 Project Management Company 33 6 Construction project environmental impact mitigation measures 35 6.1 Major environmental impact 35 6.1.1 Construction period 35 6.1.2 Operation period 36 6.2 Mitigation Measures 41 6.2.1 Construction period 41 6.2.2 Operation period 45 7 Implementation of the environmental management plan 48 7.1 Project management 48 7.1.1 Specific implementation tasks for environmental protection plans 48 7.2 Contract requirements for Environmental Management 49 7.3 Information exchange and solution of not matching scenario 49 7.4 Training-necessary capacity

文档评论(0)

zhuwo + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档