油基泥浆岩屑处理方案.docVIP

  • 294
  • 0
  • 约1.34万字
  • 约 12页
  • 2017-11-30 发布于江西
  • 举报
油基泥浆岩屑处理方案

Proposal?for the waste management program related to the oily?drilling cutting Great Wall Drilling Company Beijing, China Feb, 2011 1.Introduction Oil and gas wells cannot be drilled without creating waste. However, with good waste management practices, the amount of waste and the toxicity of waste can be reduced. By far, the greatest volume of waste generated in the drilling process is drilled cuttings. The first step and perhaps the best waste management practice is good Solids control equipment, including shakers, mud conditioners, and centrifuges. With our latest technologies in Drillin

文档评论(0)

1亿VIP精品文档

相关文档