IEEE模板格式论文.doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IEEE模板格式论文

Experimental Investigation on Live Working for 1000kV AC Transmission Line Yi Hu, Linong Wang, Guiwei Shao, Kai Liu, Yuanfang, Wen, Kangzhen Wen ( Abstract--The overvoltage level of ultra high voltage transmission line with 1000KV altering current was analyzed, and the minimum working distance and minimum combinational gap under different overvoltage level as well as the minimum effective insulating length of insulating tools were determined by various experiments. The screen clothing which could be applied to live work for 1000kV transmission line was developed. The surface and inner electrical-field intensities of screen clothing in different work positions on the pole were measured. The safe guarding measures under different operation mode were revised. The outcomes of these investigations provide technical reference to engineering design and live line work for 1000kV transmission line. KEY WORDS:1000kV AC transmission line;Live working;Working distance;Combinational gap;Insulating tool;Safe guarding;Screen clothing Introduction C hina is about to carry out the demonstration project of power transmission of extra-high-voltage 1000kV AC. In order to provide parameters for the design of circuitry pole as well as the technical basis and the regulations standard of the live working and the overhauling maintenance, we need to make the experimental research on the live working of the 1000kV AC transmission line. It is the first time for China to develop the research on the live working under the condition of 1000kV AC transmission line [2-4]. On the basis of each tentative data and the research results from the live working of 500kV and 750kV transmission line[5-8], this thesis has researched the work distance, the combinational gap, the work way, the work tool and the safe guarding apparatus in the live working of 1000kV AC transmission line. These research results can provide the technical basis for the engineering design as well as the live working of 1000kV AC tr

文档评论(0)

zhuwenmeijiale + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:7065136142000003

1亿VIP精品文档

相关文档