水手工艺-中文版-新版.pptVIP

  • 17
  • 0
  • 约3.28万字
  • 约 71页
  • 2017-12-09 发布于北京
  • 举报
水手工艺-中文版-新版.ppt

1-首缆(head line);2-尾缆(stern line); 3-前横缆(forward breast line); 4-后横缆(aft breast line); 5-前倒缆(fore spring line); 6-后倒缆(aft spring line) 3) Safety calling (About navigation safety or important weather warning)—On working channel (1) Securite (3 times) (2) Address (3 times) (3) Identity (3 times) (4) Securite (5) Message (6) Out. CHAPTER TWO JOINT INSPECTION I. The procedure of a voyage: 1. Application for entry 进口申请(到港一周前,通过当地代理办理。内容:船舶 资料等。) ETA(72—24 hours before arrival at the port)预报 DTA(24—0 hours before arrival at the

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档