- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
FIDIC可变更,索赔,调价事项归纳与对比
可变更事项对比
条款 内容 可否变更 黄皮书 银皮书 3.3 Instructions of the Engineer(银皮书为3.4 Instructions) The Engineer may issue to the Contractor (at any time) instructions which may be necessary for the execution of the Works and the remedying of any defects, all in accordance with the Contract. The Contractor shall only take instructions from the Engineer, or from an assistant to whom the appropriate authority has been delegated under this Clause. If an instruction constitutes a Variation, Clause 13 [Variations and Adjustments] shall apply. 是 是 4.6 Co-operation The Contractor shall, as specified in the Contract or as instructed by the Engineer, allow appropriate opportunities for carrying out work to:
(a) the Employer’s Personnel,
(b) any other contractors employed by the Employer, and
(c) the personnel of any legally constituted public authorities,
who may be employed in the execution on or near the Site of any work not included in the Contract.
Any such instruction shall constitute a Variation if and to the extent that it causes the Contractor to incur Unforeseeable Cost. Services for these personnel and other contractors may include the use of Contractors Equipment, Temporary Works or access arrangements which are the responsibility of the Contractor. 是 是 4.12 Unforseeable Physical Conditions(银皮书表述为Unforseeable Difficulties) If the Contractor encounters adverse physical conditions which he considers to have been Unforeseeable, the Contractor shall give notice to the Engineer as soon as practicable.
This notice shall describe the physical conditions, so that they can be inspected by the Engineer, and shall set out the reasons why the Contractor considers them to be Unforeseeable. The Contractor shall continue executing the Works, using such proper and reasonable measures as are appropriate for the physical conditions, and shall comply with any instructions which the Engineer may give. If an instruction constitutes a Variation, Clause 13 [Variations and Adjustments] shall apply.
您可能关注的文档
- 教学设计整合-Module 4 A Social Survey--My Neighbourhood.doc
- 四级写作过关系列:每天10个句子英文写作佳句300例.doc
- 各种能吃的东西的英文对照名字.doc
- 朗文少儿英语基础级经验分享.doc
- 英美文学 谭淑明.docx
- 美国高中生英文水平的100个单词.docx
- 老友记 日常用语.doc
- 专转本英语上课讲义.doc
- 朗文口语考试TOPIC.docx
- 河南省豫南九校2017届高三质量考评(八)英语.doc
- 2025AACR十大热门靶点推荐和解读报告52页.docx
- 财务部管理报表.xlsx
- 高中物理新人教版选修3-1课件第二章恒定电流第7节闭合电路欧姆定律.ppt
- 第三单元知识梳理(课件)-三年级语文下册单元复习(部编版).pptx
- 俄罗斯知识点训练课件-七年级地理下学期人教版(2024).pptx
- 课外古诗词诵读龟虽寿-八年级语文上学期课内课件(统编版).pptx
- 高三语文二轮复习课件第七部分实用类文本阅读7.2.1.ppt
- 高考物理人教版一轮复习课件第4章第3讲圆周运动.ppt
- 高考英语一轮复习课件53Lifeinthefuture.ppt
- 2025-2030衣柜行业风险投资发展分析及投资融资策略研究报告.docx
文档评论(0)