- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
WTP主变配电间
CNTIC BSEEC
JV 2.Operation,MaintenanceTrouble Shooting V/P NO. PAGE PROJECT NAME KARNAPHULI WATER SUPPLY PROJECT PHASE1(KWSP)-C1 DOC.NO. CUSTOM CHITTAGONG WATER SUPPLYSEWERAGE AUTHORITY(CWASA) Rev.NO. Sub Title 4Steps of HV power ON/OFF to the WTP
4.Steps of HV power ON/OFF to the WTP
4.1 HV power on of WTP
STEP1. The HV power of Energypac is on to 33kV isolation switch outdoor. The DC power and control power both 3.3kV and 33kV switch on, control loops of VCB is closed. The spring of VCB is charged.
?NORMAL STEP OF HV POWER ON:
① Check the 33kV voltage of INCOMING on meter, it should not too low or too high. When it’s higher than 35kV or lower than 29kV, the VCB will not close to protect load.
② Close the INCOMING isolate HV switch outdoor firmly, then lock it.
③ Close the INCOMING VCB on remote control panel by operate DISCRPANCY SWITCH FOR BREAKER.
④ Check voltage on 2nd remote panel, then close the VCB of main transformer.
⑤ Check MV voltage of transformer,it will be 3.3kV.
STEP2. The HV power from 33kV switch will go to the main transformer by close the HV VCB.
STEP3. The power of main transformer come to MV entrance, if the voltage of main transformer is stable and correct, then close the breaker of INCOMING. If it looks stable, then do flowing step.
STEP4. The MV power is on busbar , we need send it to each pump panel we need.
STEP5. Send MV power to pump drive panel, pump engineer could test and run the motor of pump.
STEP6. Send MV power to LV transformer, set each useful loop standby.
4.2 HV power OFF of WTP
STEP1, Power OFF all MV load breaker, include LV transformer. We do not open HV VCB or switch with MV load.
STEP2, Disconnect the link pad of GEN AUTO-Start, then switch OFF the MV INCOMING breaker.
STEP3, NORMAL STEP OF HV POWER OFF:
① Open the VCB of main transformer.
② Open the INCOMING VCB on remote control panel by operate DISCRPANCY SWITCH FOR BREAKER.
③ If needed, open the INCOMING isolate HV switch ou
您可能关注的文档
- MICE Contract 宴会合同.doc
- 一周突破四级英语复习材料.doc
- 雅思初级词汇5000.doc
- 四六级听力-151组易混淆拼错的词汇.doc
- 美国旅游计划【中文版对照版】【签证申请必备】--匹兹堡.doc
- Advertisement 2月26.docx
- 华南农业大学 2009 ACM题目.doc
- 2014洛阳二外小升初英语试卷.doc
- 供砂合同英文版 Supply Sand Agreement (新加坡-马来西亚).doc
- 缩略语对照大全.doc
- 深圳半导体测试机项目实施方案 .pdf
- 物理学专业本科人才培养方案专业代码070201物理学类,大类代码0702.pdf
- 甘肃半导体分立器件项目实施方案参考范文 .pdf
- 第1节等式性质与不等式性质--2025湘教版高中数学一轮复习课件(新高考新教材).pdf
- 课时规范练56 利用空间向量证明平行、垂直与利用空间向量求距离--2025湘教版高中数学一轮复习课件(新高考新教材).pdf
- 课时规范练72 随机抽样、统计图表--2025湘教版高中数学一轮复习课件(新高考新教材).pdf
- 解答题专项❹ 第1课时 利用空间向量证明平行、垂直与利用空间向量求距离--2025湘教版高中数学一轮复习课件(新高考新教材).pdf
- 第1节分类加法计数原理与分步乘法计数原理--2025湘教版高中数学一轮复习课件(新高考新教材).pdf
- 课时规范练75 分类加法计数原理与分步乘法计数原理--2025湘教版高中数学一轮复习课件(新高考新教材).pdf
- 课时规范练32 函数y=Asin(ωx+φ)的图象及应用--2025湘教版高中数学一轮复习课件(新高考新教材).pptx
文档评论(0)