丝绸大厦深基坑设计计算书—课程设计
丝绸大厦深基坑支护设计
摘 要
本设计是丝绸大厦的基坑支护设计。地基土层主要由素填土、淤泥质粘土、粉质粉土、粉质粘土构成。地形为坡地,局部为水塘。由人工推填平整,场地较平整。原始地貌为侵蚀性堆积岗地。
主体基坑支护采用分两侧采用不同的支护体系支护:一种是钻孔灌注桩加锚杆的支护体系,采用钻孔灌注桩的基坑开挖深度为9m,总桩长13m;一种是土钉墙支护,基坑开挖深度10m。基坑采用深层搅拌桩止水,排水沟排水。土层锚杆作为一种新兴科学,将会更广泛地运用到工程实践中,其具有较高的科学性、使用性,且施工方便,不占场地。
设计的主要内容有支护方案的选择、钻孔灌注桩的设计与计算、土钉及锚杆的计算、基坑的止水和施工组织设计和概预算。
关键词:深基坑支护;土钉墙;钻孔灌注桩;深层搅拌桩;锚杆支撑;施工组织设计;概预算。
Silk Building’s Pit Support Design
Abstract
The design is the hole excavated for building foundation supports and protections design of the silk building. The foundation soil is primarily made of foundation-filling soil,mud clay, silty silt, silty clay.This terrain is covered with slopes,and some parts are reservoirs. It is pushed to be smooth Artificially, and the venue is a formation. Primitive landform of it is a corrosive stack hillock place.
The main body of the hole excavated for building foundation supports and protections use different supports and protections systems to support and protect from two sides. One kind is the supports and protections system by useing the drill hole filling pile added with the anchor rod.The excavation depth of the structure is 9m, and the total length of the pile is 13m . Another way is the use of earth nail wall supports and protections,and the excavation depth of the structure is 10m. The hole excavated for building foundation uses the in-depth agitation pile to stop water and the drain to drain water . The soil layer anchor rod will be used in the project practice more widely as one emerging science, and it will be of higher scientific nature, use nature, and it will be constructed conveniently and it will not occupy the location.
Primary coverage of the design contains the choice of the supports and protections plan, the design and the computation of the drill hole filling pile, the computation of the earth nail and the anchor rod, the water stopping of the hole excavated for building foundation,the construction organization plan and budgets generally.
Keywords: Deep ho
您可能关注的文档
最近下载
- 2024年4月广东深圳市光明区马田街道办事处招聘一般专干及笔试历年典型考题及考点剖析附答案带详解.docx
- 文秘技能大赛题库完整.pdf
- 建筑工程图集 07SJ504-1 隔断、隔断墙(一).pdf
- 班级管理方案和班委职责与班级管理条例(范本)合集.doc VIP
- 2025年广东省高中语文学业水平合格考试卷试题(含答案详解).pdf VIP
- 金融监管学银行监管讲义课件.pptx
- 高中体育与健康_篮球 传切配合 教学课件设计.ppt
- 二 《简单相信,傻傻坚持》(教学课件)-【中职专用】高二语文精讲课堂(高教版2023·职业模块).pptx VIP
- 人教版《劳动教育》九年级 劳动项目二《三餐有营养》课件.pptx
- 2024年中考语文一轮复习(全国)(老师用)议论文写作(练习).pdf VIP
文档评论(0)