- 4
- 0
- 约2.97万字
- 约 26页
- 2017-12-31 发布于湖北
- 举报
教案土木工程 建筑 外文翻译 外文文献 英文文献 地铁地表沉降
外文原文
Surface settlement predictions for Istanbul Metro tunnels
excavated by EPB-TBM
S. G. Ercelebi ? H. Copur ? I. Ocak
Abstract In this study, short-term surface settlements are predicted for twin tunnels, which are to be excavated in the chainage of 0 ? 850 to 0 ? 900 m between the Esenler and Kirazl? stations of the Istanbul Metro line, which is 4 km in length. The total length of the excavation line is 21.2 km between Esenler and Basaksehir. Tunnels are excavated by employing two earth pressure balance (EPB) tunnel boring machines (TBMs) that have twin tubes of 6.5 m diameter and with 14
原创力文档

文档评论(0)