- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
通用的GP-12程序初期生产遏制
NOTE: GP-12 “Early Production Containment” (GM-1920) has been incorporated into the General Motors Specific Section of the “Production Part Approval Process” procedure. Reference the Global Supplier Quality Manual (GM1927) – APQP Task 14.
注:GP-12“早期生产遏制”(GM-1920)与通用汽车“生产件批准过程”程序的规定章节是一体的。引用全球供应商质量手册(1927)-APQP任务14
SCOPE: GP-12 is to be used for all pre-production, production, service and accessory part requirements that;
1.0范围:GP-12用于所有的初始生产、批产、服务和配套件要求;
Require Production Part Approval Process (PPAP)
有PPAP要求的
Represent significant risk to the customer facility as mandated by GM
受通用委托的顾客工厂出现重大风险
DEFINITION AND PURPOSE:
2.0定义和目的:
GP-12 Early Production Containment requires a Pre-Launch Control Plan that is a significant enhancement to the suppliers production control plan and raises the confidence level to ensure that all products shipped will meet GM’s requirements. The pre-launch control plan will also serve to validate the production control plan. The Pre-Launch Control Plan should take into consideration all known critical conditions of the part as well as potential areas of concern identified during PPAP.
GP-12早期生产遏制要求一个试生产控制计划,该计划能够显著充实供方的生产控制计划以及提高可靠度来确保发运的所有产品满足通用的期望。试生产控制计划也用来验证生产控制计划。试生产控制计划不仅关注所有已知的零件的规定条件,还关注生产件批准过程期间识别的相关的潜在区域。
The purpose of GP-12 is to:
GP-12的目的是
Validate the supplier’s production control plan
确认供应商的生产控制计划
Protect our assembly and manufacturing centers and service part warehouses from quality non-conformances during critical periods
在关键期内,从质量不合格方面保护我们的装配制造中心和服务件仓库
Document the suppliers efforts to verify control of its processes during start-up, acceleration, after revisions to the manufacturing process, or when manufacturing runs are separated by 3 months or more
生产开始和加速阶段、制造过程变更后、制造过程的运行被中断3个月或以上,供应商过程控制绩效的验证要形成文件。
Ensure that any quality issues that may arise are quickly identified, contained, and corrected at the suppliers location
确保任何可能出现的质量问题在供应商的现场被快速识别、遏制和纠正
Increase involvement and visibility of supplier’s top manag
您可能关注的文档
最近下载
- 搞笑版原创《雷雨》剧本新编.pdf
- 阿尔茨海默病早期筛查新进展和智能监测技术学习班题库答案-2024华医网继续教育.docx VIP
- 2023北京海淀高一(上)期末物理(附解析).docx
- (完整)交管12123学法减分题库大全(有答案).docx VIP
- 2024年山东省政府采购判断题真题最新(2024年12月20日整理)第19套.pdf VIP
- Celestron星特朗CPWI天文望远镜控制软件使用说明书.pdf
- 汽车车载网络及总线技术 教案全套 1.1 车载网络系统认知 ---6.3 MOST总线系统认知.docx
- 中医内科学证型分类与治法方药.doc VIP
- 干洗店的服务质量管理.docx VIP
- 交管12123学法减分题库.doc VIP
文档评论(0)