- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
528质量管理-GM-gp-5供方质量过程和测量程序(ppt21)英文-程序文件
* Page * Supplier Training GP-5 December, 2001 Edition Purpose: Train Supplier personnel on changes to GP-5/GQTS Process: Explanation of GP-5 enhancements and screen shots of GQTS enhancements Product: Understanding of process and system enhancements Overview of changes made to the procedure Overview of PRR System Changes in GQTS Description of GM SupplyPower GP-5 folder What does this GP-5 Training Include? Changes to GP-5 Control and Rework Company A company approved by General Motors to perform controlled shipping level 2 inspections or other work necessary to ensure product quality. This company performs directly under the responsibility of the supplier. Line Accumulations Line accumulations are defined as unavoidable discrepancies or single cases of commodities where only initial response is needed. These PRRs will be issued on a monthly basis per part or part group. Definitions added to GP-5 Quality Performance Reports Monthly 6 panel charts that graphically display the data contained in GQTS. Charts display the following: Major Disruptions (Spills, Downtime, Stockouts) PRRs Discrepant Parts PPM Sourcing Metrics Supplier evaluation system that ranks each supplier manufacturing location in terms of overall quality in one of three categories: green, yellow or red. The ranking criteria are based on the historical commodity performance. (Example – Enhanced Metric Bid List) Changes to GP-5 Definitions added to GP-5 Changes to GP-5 Packaging PRRs (section 4.2.2) Packaging PRR s are now defined as packaging issues that cause part/specification nonconformity, or effect salability of the part. Examples: Damaged part or material that was inadequately secured in the container Container was inadequately secured in the carrier vehicle and caused part/material damage Container design and/or fabrication was inadequate and caused part/material damage Container that has been damaged by improper handling and caus
您可能关注的文档
- 2016达州市商业银行员工招聘技能测试及面试公告.doc
- 2017一建机电实务备考唐琼 讲义要点整理.docx
- 2017中考英语 第一部分 基础夯实 八上 modules 9-10复习课件 外研版.ppt
- 2017中考英语 第一部分 基础夯实 九上 modules 9-10复习课件 外研版.ppt
- 2017中考英语 题型训练 词汇运用(二)复习课件 外研版.ppt
- 2017届中考政治复习课件 考点探究 _主题七 珍惜受教育权,维护经济权利 (共42张PPT).ppt
- 2017届中考政治复习课件 考点探究 _主题一 合理利用传播媒介,尊重宽容,诚信做人 (共38张PPT).ppt
- 2017届中考数学快速提升训练07 集训九 网格作图课件.ppt
- 2017年 《南方新中考》 物理 第一部分 第六单元 第1讲 电与磁[配套课件].ppt
- 2017年一年级数学人教版下册教案.docx
- 532营销成功靠实践-营销操作人员销售实战技能培训(ppt55)-销售管理.ppt
- 5S现场管理培训课件[修订].doc
- 5S知识------新进员工培训(PPT26)-现场管理.ppt
- 637电话销售技巧(ppt29)-销售管理.ppt
- 67系统精讲-呼吸系统-第七节 支气管哮喘病人的护理[].doc
- 67系统精讲-呼吸系统-第七节 支气管哮喘病人的护理[资料].doc
- 69系统精讲-呼吸系统-第九节 血气胸病人的护理[精彩].doc
- 7-2人教版新课标七年级下英语单词表(411首字母)[方案].doc
- 800题知识(含心电图)1.doc
- 881营销管理-电话营销技巧与实例(ppt52)-销售管理.ppt
原创力文档


文档评论(0)