- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
控制测量的意义与方法
本科生毕业设计
外文翻译
姓 名
学 号
学 院
专 业
指导教师
2012年 5月 25日
Significance and Methods of Control Survey
Control Survey
In a certain area, for the geodesy, photogrammetry, topographic survey or engineering survey control network established by the measurements.
Control measurements include: ①Horizontal Control Survey is a control point for the determination of the plane coordinates carried out ② Leveling, elevation control points for the determination carried out ③ dimensional control surveying for the simultaneous determination of control points coordinates and elevation plane or space carried out three-dimensional coordinates.
In the test area, according to the required accuracy of measurement tasks, determination of a control point position and elevation plane, to establish survey control network, as the basis for various measurements, such measurements as control measurements.
Within a certain area topographic mapping an engineering measurements to establish control network carried out survey work, Divided into horizontal control and vertical control survey measurements. Horizontal control network and vertical control network of the general layout separately, can also be laid into a three-dimensional control network.
Control network has control of the situation , limiting the measurement error accumulation is the basis of the survey work. For topographic mapping, grade control is the basis for expansion of root control to ensure that the measured topographic maps can be spliced with each other as a whole. For the engineering survey. Which require special control network layout. Construction setting an deformation as the basis for observation.
Horizontal Control Network
Include:
Triangulation: triangulation to establish horizontal control network of the basic methods. However, triangulation to require every point and more links between adjacent points, as, in the hidden areas often need to build a high survey markers.
Travers
您可能关注的文档
最近下载
- 小学教育-小学新生入学适应问题研究与对策.docx VIP
- 水利工程施工监理规范(SL288-2014)用表填表说明及示例.pdf
- 2025及以后5年中国三甲基镓产业竞争现状及市场发展策略报告.docx
- SL∕T 423-2021河道采砂规划编制与实施监督管理技术规范.docx VIP
- 计量的基础知识计量基础知识.doc VIP
- 2025年五一劳动节班会安全教育PPT.pptx VIP
- 2025版《加油站事故隐患内部报告奖励管理制度》 .docx
- 苗尾功果桥水电工程创建样板工程申报资料.doc VIP
- 教师说课PPT模板 .pptx VIP
- 容积式空气压缩机19153-2009.pdf VIP
原创力文档


文档评论(0)