Environment Management Plan:环境管理计划.doc

  1. 1、本文档共91页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Environment Management Plan:环境管理计划

Environment Management Plan The World Bank Funded Chongqing Urban-Rural Integration Project Phase II (CURIP II) Environment Management Plan Feb. 2012 Contents 1 General 3 1.1 Background of CURIP II 3 1.2 Facilities for Wastewater Treatment and Solid Waste Disposal 1 2 Laws, Regulations, Standards and Safeguard Policies of the World Bank, Environment Screening and EA Processing 5 2.1 Laws, Regulations, Standards and Safeguard Policies of the World Bank 5 2.1.1 National Laws, Regulations and Relevant Documents 5 2.1.2 Sector Policies 5 2.1.3 Guidelines and Regulations on the EIA Technology 6 2.1.4 Local Regulations and Documents 6 2.1.5 Main Planning Documents 7 2.1.6 Project Relevant Documents 7 2.1.7 Assessment Standards 8 2.2 Safeguard Policies of the World Bank and the Guideline of EHS 8 2.3 EA Classification 8 3 Environmental Impacts and Mitigation Measures 9 3.1 Analysis of Potential Negative Environmental Impacts of CURIPII 9 3.2 Medical Wastewater Treatment during Operation Period of CURIPⅡ 12 3.3 Engineering Measures for Disposal of Medical Solid Waste and Control of Noise and Exhaust Gas Emission 16 3.3.1 Medical Solid Waste Disposal during Operation Stage 16 3.3.2 Engineering Measures for Medical Solid Waste Disposal during Operation Period 17 3.3.3 Engineering Measures for Control of Noise and Exhaust Emission during Operation Period 17 4 Environment Management Plan (EMP) 22 4.1 Purpose of EMP 22 4.2 Environment Management Organizations and Duties 22 4.2.1 Management Organization 24 4.2.2 Supervision Organization 25 4.2.3 Agencies Responsible of Implementation, Executing and Monitoring 26 4.3 Code of Good Practice for Environmental Management 26 4.4 Environment Monitoring Plan 46 4.5 Capacity Building 52 4.5.1 Training Program 52 4.5.2 Equipment (Material) Procurement Plan 53 4.6 Public Complaint and Feedback Mechanism 54 4.6.1 Public Complaint 54 4.6.2 Feedback Mechanism 54 4.7 Report Mechanism 54 4.8 Emergency Procedure for Major Environment Impact durin

文档评论(0)

pangzilva + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档