毕业论文-龙山至永顺二级公路初步设计
摘 要
本设计是湖南省龙山至永顺二级公路初步设计,路段地处丘陵区,沿路地形起伏在400~
The design of Hunan province Longshan to Yongshun two road sections in the preliminary design, the basin, basin surrounded by mountains surrounded by, its elevation in 400~ meters between. The two stage highway begins to pile No. K4+000, end pile No. K7+006.The main technical indexes for highway roadbed width 8.5m, a two-way dual carriageway, without the central dividing strip. The design of the speed60km/h. This design is the two highway preliminary design, first carried out the study on topographical map, in a familiar terrain map, access to the local topography and geology, hydrology and climate conditions. The initial formulation of the two route alternatives, after comparison of technical indicators and the actual engineering situation, the final choice of relatively suitable scheme. In the course of graphic design, proceed with the longitudinal design, cross-sectional design, roadbed design, roadbed design is complete, start a pavement design, considering the actual situation of the project, finally decided to take the road design of cement concrete pavement. In the design of roadbed and road surface is completed, a retaining wall and drainage and protection design. The retaining wall is used in gravity retaining wall, drainage and protection design for the side ditch drainage ditches and drainage design. After conducting a culvert and the intersection of the plane of the preliminary design, the route need to construct two culverts, using pipe culvert form,Intersection using overlay corner . At the end of the project budget, project budgetary estimate, according to the actual situation, using aspect software over the budget, budget amount ofyuan.
Keywords:Hunan,Longshan,Yongshun,two highway,preliminary design
目 录
摘 要 I
ABSTRACT II
第1章 绪 论 1
第2章 设计总说明 2
2.1 地质地貌水文状况 2
2.1.1 地形地貌 2
2.1.2 气象水文 2
2.1.3 地层岩性 2
2.1.4 沿线材料供应 2
2.2 工程概况 3
2.3 交通量资料 3
2.4 设计依据 3
第3章 路线设计 5
3.1 道路等级确定 5
3.1.1初始年交通量的确定 5
3.1.2
您可能关注的文档
最近下载
- 高压液氧泵原理、结构及检修、结构及检修课件.pptx VIP
- 内蒙古版五年级上册综合实践活动全册教学设计教案.pdf
- 抗战胜利80周年党课:铭记历史担使命,砥砺奋进新征程(附文稿).pptx VIP
- 2025年基本医疗保险管理.pptx VIP
- 千岛湖汽车客运北站发车时刻表.doc VIP
- 跟动物学“智慧”..ppt VIP
- 理事会理事候选人会员代表推荐表.docx VIP
- 人民医院被服库采购、驻店及配送服务项目(2包:巾单辅料等被服类) 投标方案(技术标).doc VIP
- 环保行业管道直饮水行业解读与项目盈利性分析:自来水的消费升级.docx VIP
- 2025粤港「组装合成」模块化建筑跨境贸易指南.pdf VIP
文档评论(0)