- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
附录Ⅱ外文资料及翻译Straight to the source of seepageJim Swaisgood, Jerry Montgomery and Val Kofoed report on the investigative work undertaken to discover the source of seepage at River Reservoir dam in the US.Water seeping through an earthen embankment suggests a number of possible circumstances, and none of them are good. At best, the reservoir owner is losing a valuable commodity. The worst case scenario is that the seepage may be the precursor of dam failure. The first step in addressing a problem with seepage is as obvious as it is difficult: pinpointing its source. In the past, procedures for determining the exact location and nature of seepage points have been both costly and time consuming. Of course, when dam failure is imminent, there is much more than money and time at stake; the efficiency and speed with which engineers can locate the source of seepage may make the difference between a timely fix and catastrophe. River Reservoir dam is an arched earthen structure on the headwaters of the Little Colorado River. It is located about 24km southwest of Eagar, Arizona, US, and is owned and operated by Round Valley Water Users Association (RVWUA). Based on very limited engineering, the dam was constructed by settlers in 1896 of local materials and without a clay core. Due to recurring sloughing problems, the dam received significant modifications on at least four separate occasions. The embankment consists of clayey soils within a rockfill shell, measuring 335m long with a maximum height of approximately 21.3m and is founded upon basalt bedrock.In 1996 additional riprap was installed to reduce the original slope of the upstream and downstream faces. A review of the early inspection reports revealed that the left abutment drain was constructed using tabular rocks to create a box-shaped opening over the rock foundation. However, the contacts between these rocks were neither sealed nor grouted. There has been much speculation regarding the original purpose of this drain. M
文档评论(0)