酚醛复合风管施工工艺.doc

酚醛复合风管施工工艺

酚醛复合风管施工工艺 Construction technology of Phenolic aldehyde Composite wind pipe 放样工艺过程 一、Lofting process 1、细解风管施工图,确定空调设备及风管各部件的安装位置,将风管系统拆解为直风管、弯、变径、三通、四通等等; 1.Explain the production drawing of the wind pipe in detail, make sure the installation position of air-conditioning equipment and each part of wind pipe, and take apart the wind pipe system into straight duct,curve,reducing,triplet,cross,etc; 2、确定各直风管及异型管的合理长度和数量; 2.Make sure the reasonable length and quantity of every straight duct and special section tube; 3、确定风管与空调设备及风管各部件的连接方式及相应的连接辅件; 3.Make sure the connection ways and the correspo