- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
[英语学习]2007年5月人事部三级笔译真题
2007年5月人事部三级笔译真题
第一部分 英译汉
??? It took nine years from the time the Danish and Swedish governments agreed to build a fixed link between their countries to the time the first car, train, truck and bicyclists crossed the Oresund Bridge.
??? Construction of the bridge, including design and cornerstone, began in March 1991 and was completed in July 2000. Today, it is the longest stone-stayed road and rail bridge in the world. At approximately 10 miles (16 kilometers), including the tunnel, it is an engineering and architectural marvel. But as time has proven, the bridge is a cultural and economic boon as well. The sleek span of concrete whose design typifies Scandinavian minimalism has contributed greatly to the development of the Oresund region: the eastern part of Denmark, including Copenhagen, and the southwestern part of Sweden, including Malm? and Lund.
??? The level of commuting between Malm? and Copenhagen has quadrupled since the opening of the bridge in 2000, and the number of Danes moving to the south of Sweden has increased sixfold. The Oresund region has become a cultural and economic powerhouse, considered a model region by the European Union.
??? Work on the bridge began in 1995, and was undertaken by a team of international consulting and construction companies.
????From the beginning, construction of the bridge complied with some of the world’s toughest environmental regulations, as well as many advanced design and construction details. The Mexico-based CEMEX, one of the world’s largest producers of Cement and ready-mix concrete, was awarded a contract to deliver tons of high-quality cement to help build the main part of the bridge, the two approach bridges and the tunnel.
????When it opened in July 2000, the Oresund Bridge consisted of a 3.5-kilometer immersed tunnel, the largest of its kind in the world, a 4-kilometer long artificial island (made from mud dug out from the bottom of strait to make space for the tunnel) and a 7.8-kilometer cable-stayed br
您可能关注的文档
最近下载
- 知识产权法智慧树知到期末考试答案章节答案2024年同济大学.docx VIP
- 临床医学教学模式创新与课堂互动设计.pptx
- 生猪屠宰兽医卫生检验人员理论考试题库资料及答案.pdf VIP
- 天津市静海区2024-2025学年高一下学期6月学生学业能力调研试题 地理试卷含答案.docx VIP
- 有限空间安全作业技术交底.docx VIP
- 消防设施操作员(中级监控方向)理论知识考试题库(含答案解析).pdf VIP
- 小学校园心理危机干预培训.pptx VIP
- 《内部控制与风险管理(第3版)》思考题和案例分析答案6-10章.docx VIP
- 军职在线-雷达原理-2023年春期末考试答案.docx VIP
- 佛山第六次人口普数据分析.doc VIP
文档评论(0)