外文文献翻译承包商在投标过程中的风险和价格其他专业.doc

外文文献翻译承包商在投标过程中的风险和价格其他专业.doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文文献翻译承包商在投标过程中的风险和价格其他专业

毕业论文外文文献翻译 Risk and Price in the Bidding Process of Contractors Samuel Laryea1 and Will Hughes2 【Abstract】Formal and analytical risk models prescribe how risk should be incorporated into construction bids. However, the actual process of how contractors and their clients negotiate and agree to price is complex and not clearly articulated in the literature. With participant observation, the entire tender process was shadowed in two leading U.K. construction firms. This was compared with propositions in analytical models, and significant differences were found. A total of 670 h of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%), and travel (1%). Risk allowances of 1–2% were priced in some bids, and three tiers of risk apportionment in bids were identified. However, priced risks may be excluded from the final bid to enhance competitiveness. Although risk apportionment affects a contractor’s pricing strategy, other complex microeconomic factors also affect price. Instead of including pricing contingencies, risk was priced primarily through contractual rather than price mechanisms to reflect commercial imperatives. These findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids. 【Keywords】Bidding; Contractors; Participant observation; Risk apportionment; United Kingdom Introduction Formal and analytical risk models that contractors can incorporate into the bidding process for the purpose of allocating risk contingencies have proliferated in recent years [e.g., a fuzzy set model by Zeng et al. (2007); a fuzzy logic-based artificial neural network model by Liu and Ling (2005); a fuzzy set model by Pa

您可能关注的文档

文档评论(0)

weizhent2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档