- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程管理 毕业设计英文 外文 文献 翻译 浅谈逐层次分析法在建筑工程项目施工组织设计评价中应用
On the level of analysis-by-construction projects in the evaluation of construction design applications
Abstract: The construction project construction design analysis of technical and economic indicators, established by the construction plan, construction schedule and construction plan layout consisting of technical and economic evaluation index system, the use of layer ordering relation analysis for design evaluation of the program and methods of engineering examples to verify the effectiveness and feasibility. The results show that the evaluation method using an indicator system can select the best construction organization design, and conceptual clarity, the calculation convenient, effective and true method of operability.
Keywords: layer sequence analysis of the relationship; construction projects; construction design; technical and economic indicators
Introduction
Construction design is based on national or owners of the proposed project requirements, design drawings, the whole process from project construction in the human, material and space of three elements working in the human and material resources, the main and auxiliary, supply and consumption, production and storage, professional and collaboration, use and maintenance, spatial arrangement and time arranged in areas such as scientific, rational deployment, for the construction of rhythm, balance and continuity to provide the optimal solution [1]. That is the design intent and design to achieve the results into the overall plan for construction projects of technical and economic effects have a decisive role. Construction on the building project designed to evaluate the organization is intended to demonstrate its technical feasibility, economic reasonableness, when in a multi-program evaluation to determine the optimal solution. However, the construction design of a variety of technical and non-economic evaluation and more unified, m
文档评论(0)