- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
全充全采对拉工作面顶板运移及地表沉陷规律研究毕业论文精选
分类号 : TD3 密 级 :公 开
UDC: 单位代码 :424
学 位 论 文
摘要
近些年来我国经济进入持续发展阶段,致使国家工业部门煤炭需求持续增长,煤炭。Abstract
In recent years,Chinas economy continued to enter the stage of development,national industrial sectors,especially the power sector demand for coal continues to increase,therefore,Chinas coal production will continue to grow. The report of 18th CPC Central Committee put forward that “The building of ecological civilization system is the well-being of the people,the nations long-term future plans.” Implementing the partys policy,therefore,following the environment-friendly green mining road is imperative.
In this paper, those are studied that?methods of controlling surface subsidence for Double-Unit Face,Shallow buried coal seam?,based on the theories of controlling Surface subsidence for fill mining and Mining pressure and strata control,integrated the methods of Theoretical Analysis、Field monitoring、Numerical Analysis. Firstly,analyzing overburden failure law of fill mining and factors of overburden control,surface subsidence factors include three aspects: ground settlement amount、compression amount、lithology. According to the analysis of?the main?factors?of the mining subsidence,taking appropriate measures for its control in order to reduce the effect of these factors.The first east mining area of Ji Suo mine included two parts,the former strip mining block sections that has been mined under buildings and the block sections that hasn’t been mined not under buildings. The block sections that not under buildings include two Double-Unit Faces,the face use the process of full filling and full mining,one filling by one mining,realizing the recycling process. And then increasing the service efficiency of the system and the labor efficiency,the slowdown waste is avoided.
The research of this subject can help to solve a series of environmental and safety problems caused by
您可能关注的文档
最近下载
- 中国国家标准 GB 4806.11-2023食品安全国家标准 食品接触用橡胶材料及制品.pdf
- 2025-2026学年小学信息技术清华版2012六年级上册-清华版(2012)教学设计合集.docx
- 光伏电站检测规范.docx VIP
- 监理实施细则(装饰装修工程).docx
- 《古建筑油漆彩画作》课件——绪论 古建筑彩画概论.pptx VIP
- 《古建筑油漆彩画作》课件——中国建筑彩画产生及发展简况.pptx VIP
- 心脏介入治疗流程图解.pptx VIP
- 《古建筑油漆彩画作》课件——第四章 清代建筑彩画.pptx VIP
- 《蝙蝠侠:黑暗骑士》完整中英文对照剧本.docx VIP
- 《古建筑油漆彩画作》课件——第五章 晋系地方建筑彩画.pptx VIP
文档评论(0)