中水电站厂房结构设计 毕业设计.doc

  1. 1、本文档共55页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中水电站厂房结构设计 毕业设计

中水电站厂房结构设计-毕业设计 Abstract This graduation design for building structure design of water conservancy and Hydropower Engineering in hydropower station. The design of hydropower station plant 66m, span 18m, the design of space 6m, the slope of trapezoid steel roof truss, crane beam and frame structure for the reinforced concrete structure. Structural design is the priority among priorities to ensure the safety, the principle is to guarantee the safety, applicability, durability, and make the design reasonable economy. The structure design according to the known data, the main contents are: the typical cross section of hydropower plant, layout of workshop structure, crane beam design and reinforcement, slope of trapezoid steel roof design, layout design and structural frame pillar reinforcement, and the corresponding construction drawing. Bearing structure of crane beam is directly under the crane load, is an important structure of the workshop, the design of crane beam is simply supported structure, cross section by T. Steel truss design, assuming that all the members in the same plane, member center lines converge on the centre of the node, and each node is the ideal hinge, without considering the effects of secondary stress calculation of axial force, the application frame internal force coefficient method. Bent frame structure is simplified as a plane structure is calculated, which assumes that the bent frame column is hinged at the lower end and roof, and the top surface of the horizontal displacement of foundation consolidation, equal at both ends of the truss column, not considering the spatial effect of shelving. Keywords:building structure layout, trapezoid steel roof truss, crane beam design, frame structure design 目录 绪 论 1 第一章 TH水电站工程原始资料 2 一 工程概况 2 自然条件 2 厂房尺寸 2 四 主要水力机械及设备 3 4 一 横向定位轴线 4 二 纵向定位轴线 4 三 柱网布置 4 第章 吊车梁设计 4 4 二 吊车梁荷载计算 5 (一)吊车梁自重计算 5 二集中荷载计算 6 (三)横向水平制动力计算 6 7 ()吊车梁弯矩计算 7 ()吊车梁剪力设计值计算 8 ()吊车

文档评论(0)

weizhent2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档