- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
制造技术基础英语基本概念
制造技术基础复习基本概念、基本原理英语表达参考
Review the Basic Concepts and Principles of Fundamentals of Manufacturing Technology in English
Chapter One Design for Mechanical Process Planning
Section 1 Basic concepts
Production procedure of mechanical products
Process procedure of machining
Elements of Process procedure of machining
1 sequence 工序;2 installation 安装;3 station 工位;4 step工步; 5 pass走刀
Sequence: process procedure that consists of several sequences during which workers operate on the works continuously in the same place;(操作者、加工地、工作对象——人为划分,相对可变)
Installation: in a sequence if the work is required to put into position and clamp several times,the part of sequence done in one positioning and clamping is called an installation;(确定)
Station: In an installation, by using the indexing or moving device the work is changed its position relatively to the cutting tool. All the tasks done for the work in one machining position in an installation is termed as the station;(确定)
Step:In one station if the surface cut, cutting tool, velocity, and feed remain unchanged, these working contents are thought of as the step.(加工表面、刀具、切削速度、进给量任一改变均为另一工步)
Pass: When the surface of the work is cut for any one time ,such task carried out is named as the pass
(刀具在加工表面的每一次切削)
Processing system:
a system that contains the work to be machined, fixture that holds the work in the proper position, cutting tool that machines the work directly, and machine tool that gives the power and provide the movements to accomplish the processing. In recent years the gauging and measuring is added to the system.
Relationship between the batch and the pattern of production
N-program of production, Q-annual turnout of the product
n-number of the components a year,
-share rate, -waste rate, F -annual working days,
A- number of days for inventory, -number of components in a lot
A Program of production
In a period of planning, the turnout of product and schedule to be fulfilled is called program.
文档评论(0)