第四节_CRH1列车网络控制系统ok.ppt.ppt

  1. 1、本文档共54页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第四节_CRH1列车网络控制系统ok.ppt

In the master CCU both the master and local blocks execute, whereas in the slave CCU only the local blocks execute. When the driver inserts the driver’s key in the cab the following sequence is started: 1)????? The Active cab input is detected by a Digital Input/output unit (DX) 2)????? The Active cab status is sent over the MVB from the DX unit to the Train Control CCU 3)????? The definition and configuration software in the Train Control CCU performs a number of controls (for instance that all critical devices on the local MVB are all functioning and that no other cab is active in the train). 4)????? The Train Control CCU sends a signal via the MVB to the Gateway (GW) ordering the GW to perform a configuration of the WTB. 5)????? The GW configures the WTB by sending data to the other Gateways via the WTB. When the WTB configuration is completed the Gateway in the active cab is in the strong master state on the WTB and the other Gateways are slaves. A strong master state of the Gateway means that it is master and the cab is active which prevents another cab activation to result in a new configuration. 6)????? When the WTB configuration is completed and the local Gateway is strong master a signal is sent from the Gateway over the MVB to the Train Control CCU that it is master. 7)????? The Train Control CCU then activates the Master application software in the active cab. When this sequence is completed the train is in the state as shown in the figure above. The strong master state prevents that another cab activation results in a new configuration. When the TCMS is configured with a master and no active cab the Gateway in the last active cab is in the weak master state (see figure on previous page). When the train is in this state and a cab is activated the following sequence takes place: 1)????? The Active cab input is detected by a Digital Input/output unit (DX) 2)????? The Active cab status is sent over the MVB from the DX unit to the Train Control CCU 3)?

您可能关注的文档

文档评论(0)

aena45 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档