- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Prestressed Concrete Technology
提纲:
摘要:预应力混凝土的定义
正文:预应力混凝土的应用、实例应用
讨论:预应力混凝土的优点和缺点
总结:预应力混凝土的发展的前景
Introduction
Prestressed concrete and reinforced concrete in principle are clearly different. In the design of the reinforced concrete beams, regardless of the concrete can be assumed that the tensile strength, for bending moment of tension is caused by reinforced to resist, the tension is through between reinforcement and concrete bonding and passed to the steel. For large scale craze and deformation for, although the high strength concrete has good bonding, to a great extent can restore; But in the concrete and steel bonding between poor ordinary concrete, is in fact cant recover. On the other hand, in the prestressed concrete, the purpose of prestressed reinforced by rapping or through the special is the anchorage to exert a force concrete, so all can have the function of concrete structure. Requirements of prestressed steel is used to produce active component in advance to add load, and cracking and deformation in larger extent can be restored.
Abstract
In order to avoid reinforced concrete structure of the premature fracture, make full use of high strength steel and high strength concrete, tried to in the concrete structure or structures under load before use, through the force applied, make by the tensile stress components is reduced, and even in pressure stress state of concrete component.
Preloading stress is used to reduce or offset load caused by the concrete tensile stress, and the structure of the components in the smaller tensile stress control range, and even in the compression state, to delay the generation of crack in concrete and development, so as to improve the anti-cracking performance component and rigidity.
Main text
Prestressed concrete component to the method of pretensioned stressing and posttensioned.
1.pretensioned stressing
In the concrete pouring, first by steel wire steel strand or will be composed of the prestressed tendon pulled to
您可能关注的文档
- AAO+MBR组合工艺脱氮除磷性能研究毕业设计论文.doc
- AAS法测定酸枣汁中锶的含量 化学工程与工艺专业工业分析方向分析化学毕业论文.doc
- android编程的毕业设计论文.doc
- ArouseStudents'InterestbyCreatingLearningEnglishSituation英语毕业论文.doc
- DS18B20数字温度的设计报警器学生毕业设计.doc
- dsp原理与应用论文基于DSP技术的MP3播放器的研究与设计.doc
- dsp技术综述论文数字信号处理DSP技术.doc
- EDA课程设计论文基于EDA技术倒计时器的设计.doc
- EQ1092货车的前后悬架系统的设计车辆工程专业本毕业设计论文.doc
- FTP服务器技术研究与实现毕业设计论文.docx
- 多点监督与特征融合校准:目标检测算法的创新与突破.docx
- 南宁市门诊HIV_AIDS患者抑郁状况剖析与影响因素探究.docx
- 医疗过失犯罪中客观归责理论的精准适用与深度解析.docx
- 南宁市低碳经济发展研究.docx
- 清解瘀毒胶囊对脑出血大鼠血红蛋白毒性作用及机制探究.docx
- 内蒙古赤峰市元宝山区农村小学教师培训:现状、问题与突破路径.docx
- 泉州开发区国有资产投资经营有限公司发展战略研究:基于区域经济与市场环境的分析.docx
- 能源利用效率与经济增长方式的深度耦合及中国战略抉择.docx
- 分布式信号波达方向 - 时延联合估计算法的深度剖析与创新探索.docx
- 新媒体环境下大学校园精神传播的创新变革.docx
文档评论(0)