- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
毕业论文
外文翻译
题 目 TWICE AS NICE
(复 线 桥)
专 业 工 程 力 学
班 级 (1) 班
学 生 刘 栩
指导教师 李 晓 红
重庆交通大学
2009 年
TWICE AS NICE
To increase road capacity in the state of Queensland in Australia, the iconic Brisbane Gateway is being expanded-by building a near-duplicate alongside. Report and photographs by Adrian Greeman.
Doubling of the Brisbane Gateway bridge could have been seen as an opportunity to explore some of the latest bridge design trends. After all, the original high, slender, concrete arch striding over the estuary on the seaward side of the city was a deliberate statement, intended as an icon for the Queensland state capital. In the 1980s when the bridge was built, Brisbane was transforming itself from a provincial backwater into a world city. The new bridge could have been equally bold.
“But to do that would have meant coming up with something utterly different,” says Mark Palmer, deputy project manager for the Leighton Abigroup Join Venture which is building the new bridge, now well into construction and rising to its full 64.5m height. “There is nothing worse than a half-hearted or mismatched variation”.
Radical change is also ruled out by constraints at the site. Firstly the bridge must sit more or less alongside its 1986 original, because its function is to widen the existing motorway crossing on the same alignment. More importantly, it must keep within the same tight dimensional envelope that governed the first. It has to provide a substantial vertical clearance of some 57m. The Brisbane river has a central channel more than 9m deep, which is sufficient for big cruise liners which moor upstream. But even this height means they only just pass below the existing bridge by a metre and a half. Fortunately the river’s tidal range is not excessive. At the same time the height of the structure must be kept as low as possible, because the Brisbane International airport is located
文档评论(0)