土木工程专业综合商住楼基坑支护设计
摘 要
商住楼邯郸市区南部,光明大街西侧原光明饮料厂内,地上29层,地下1层,建筑高度87.0m,结构形式拟采用剪力墙结构,地基基础设计等级均为乙级。基坑深度10m。
通过对拟建场地的工程地质条件分析,地下水位较浅,采用挡水措施。由于基坑深度不大,因此可试着考虑采用较简单的基坑支护措施,以保证基础正常施工和主体地下结构的安全和周围建筑物不受损害。
在本次基坑支护设计过程中,考虑到施工经济等原因,根据场地的土层条件及邯郸市类似基坑工程的经验,为保证基坑的稳定性及尽量节省投资,对基坑壁先进行了等级划分,对不同等级的基坑壁拟采用不同的支护方案。先后分析了两种方案:1.悬臂桩支护;2.悬臂桩加锚杆支护;3.土钉墙支护。由于基坑较深,计算得出悬臂桩变形和位移较大并且配筋很不经济,所以被排除。悬臂桩加锚杆的方案中,可附加单排水泥土挡墙起挡水的作用。除北侧基坑壁等级为二级外,其余皆为一级,因此除北侧外采用了相同的支护方案。
关键词:土钉墙 单支点排桩 基坑支护
Abstract
Proposed composite commercial residential buildings in Handan City, Rochester head Handan urban south, the west side of the street bright light drinks factory, 29 of the ground, underground floor, building height 87.0 m, the form of a shear wall of the structure, the foundation design class Category B are. Pit depth of 10 m. Through the proposed venue of the engineering geological conditions, the shallow groundwater level by retaining measures. As little depth of excavation, it may try to consider adopting a simpler foundation pit support measures to ensure that the basis for normal construction and the safety of the main underground structures and surrounding buildings will not be harmed. In the pit supporting the design process, taking into account the construction of economic and other reasons, according to the site and soil conditions similar excavation works in Handan City of experience, to ensure the stability of the pit and save as much as possible investment, the pit wall To a ranking of the different levels of pit wall to a different support programmes. Has analyzed two options: 1. Cantilever pile support, 2. Cantilever pile and bolting 3. Soil nail wall support. As deep pit, piles cantilever calculated deformation and displacement of very large economic and reinforced, so be excluded. Cantilever pile and the anchor of the programme, additional single-soil drainage from the retaining wall of the role. In addition to the north pit wall for the two grades, the rest were level, using the same support program
您可能关注的文档
最近下载
- 2025至2030全球及中国普拉提和瑜伽馆行业市场深度研究及发展前景投资可行性分析报告.docx VIP
- 极速60秒.ppt VIP
- 中国宠物行业白皮书.doc VIP
- 项目插花艺术-全校公选课.doc VIP
- 极速60秒的图片.ppt VIP
- 展频IC规格书之 SSDCI1108AF _REV3.1.pdf VIP
- 2024 CCF非专业级别软件能力认证(CSP-S)第一轮真题.pdf VIP
- TCFNA6104-2022 食品安全-月桂叶(香叶).pdf VIP
- 人美版(2024)小学美术一年级上册《欢快流畅的线》教学设计 .pdf VIP
- 三水平立井多绳摩擦式提升机提升钢丝绳更换安全技术措施:.doc VIP
文档评论(0)