[建筑]地铁隧道爆破开挖对地表建筑物的影响
26 6 2007 12
Vol.26 No.6 Journal of Liaoning Technical University Dec. 2007
1008-0562(2007)06-0871-03
1,3 2
(1. 454000 2. 454000
3. 471023)
,
TD 235.1 A
Effect of blasting digging on surface buildings in metro tunnels
YU Yong-qiang1,3WEN Guang-chao2
1. Rock Soil and Underground Project Research Institute, Henan Polytechnique University, Jiaozuo
454000, China; 2.College of Resources and Environment Science, Henan Polytechnique University, Jiaozuo
454000, China; 3.The Third Engineering Institute of General Staff, Luoyang 471023,China
Abstract Based on analyzing seismic velocity and frequency of the main control factors of them, according to the
data measured on surface buildings when Shenzhen Metro tunnel is being dug by blasting, the relation formula
among seismic velocity and dynamite and the distance between blasting fountain can be obtained. Effects on
buildings produced by vibration frequency and differences between blasting earthquake and natively seismic can
be analyzed. The results of tests and research indicate that we must attach importance to blasting seismic rules and
effects on different buildings in order to make basting techniques bring much economic benefits and reduce harm
of blasting vibration as much as possible.
Key words blasting cutting seismic effect seismic velocity
⎧