国际工程的施工管理程序Construction Management Guidelines and Procedures for International Projects.doc

国际工程的施工管理程序Construction Management Guidelines and Procedures for International Projects.doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国际工程的施工管理程序Construction Management Guidelines and Procedures for International Projects

PROCESS SYSTEMS ENGINEERING FABRICATION AND ERECTION SPECIFICATION Construction Management Guidelines and Procedures for International Projects 600.100 Revision 0 June xxxx Page 1 of 10 RESPONSIBLE GROUP: Construction Engineering Table of Contents DOUBLE CLICK ON GREEN NUMBER TO GO TO THAT SECTION Section Title Page Purpose 2 Scope 2 Related Documents 2 Construction Execution 2 Safety 3 Bidding Procedures 4 Contractor and Subcontractor Management 5 Schedule Control 5 Weekly Meetings 6 Field Reporting 6 Quality Assurance/Quality Control 7 Construction Change Orders (CCO) 7 Backcharges 7 Material Handling and Receiving 7 Local Approvals and Inspections 8 Design Constructibility Review 8 Supplier Inspections 8 Site Security 9 Imports and Transportation 9 Translation 9 Incentives 9 Submittals Required with CM Bid 9 Responsibility Chart 10 Final Acceptance of the CMs Work 10 DOUBLE CLICK ON GREEN TOC TO RETURN TO TABLE OF CONTENTS 1. PURPOSE 1.1. This fabrication and erection specification defines guidelines and procedures for Xxxx projects to be constructed using an integrated construction management (ICM) team, in conjunction with Xxxx representatives. 2. SCOPE 2.1 This specification applies to projects, when Xxxx has construction management responsibility, that are to be managed by one or more Xxxx site representatives and a local Construction Management firm (CM). 2.2 Xxxx and CM responsibilities are further defined in the contract specifications. 3. RELATED DOCUMENTS 3.1 Xxxx Engineering Documents 600.001 General Specifications for a Contract 600.730 Safety and Construction Procedures for International Projects T-9 Weekly Progress Meetings T-20 How to Prepare a Construction Package T-22 Commercial Documentation for Construction Bid Packages - Related Documents T-23 Checklist for Successful Bidder 4. CONSTRUCTION EXECUTION 4.1. Xxxx plans to execute the c

您可能关注的文档

文档评论(0)

shenlan118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档