PDS工程设计过程.doc

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PDS工程设计过程

Installation planning outline and checklist It is recommended that you follow this installation planning outline as a guide when planning a cabling system. Determine the scope of the cabling system installation. Building size (square meter or square feet) Number of people - Number of work areas - Number of phones per work area - Number of terminals per work area Functional areas affected - Building maintenance department - Contractors Review building plans for suitability and adaptability. Number of floors Number of data cabinets available - Combined phone and data closets - Separate phone and data closets Wiring location - Ability to communicate with other areas of the building during problem determination Environmental suitability - Temperature/humidity - Dust - Gases - Cable requirements Grounding - Structure, power, signal, piping, lightning protection, ground shift potential, and current Cabling passageways/channels - Location - Accessibility - Dimensions - Coordination with other systems Freedom from electrical environment contaminants - Radiated frequency interference (RFI) - Induced electromagnetic interference (EMI) - Electrostatic discharge interference (ESD) - Low-frequency interference (LFI) Document terminal inventory. Machine type - Model - Quantity - Services for each machine type - Relevant special features - Devices supported by cabling system - Devices that could migrate to the cabling system (for example, typewriters to office system). Document logical network configuration. Document data flow between machines. Document related software systems (MVS, DOS/VS, VM, and others) and subsystems (CICS, IMS, VTAM, NCP) as required for problem determination. Document physical network topology. Obtain building floor plans. Develop or use existing coordinate matrix system so that each work area or data cabinet can be uniquely identified by its coordinates. Draw a wiring diagram superimposed over the floor plans. - Indicate vertical cable runs - Indicate loca

文档评论(0)

xy88118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档