规范水土保持方案编报程序、编写格式和内容的补充规定(Supplementary regulations for compiling and reporting procedures, compiling formats and contents of soil and water conservation schemes)
规范水土保持方案编报程序、编写格式和内容的补充规定(Supplementary regulations for compiling and reporting procedures, compiling formats and contents of soil and water conservation schemes)
Supplementary regulations for compiling and reporting procedures, compiling formats and contents of soil and water conservation schemes
I. submission of the soil and water conservation scheme
(a) the classification
The outline and report of soil and water conservation plan for development and construction projects (hereinafter referred to as program) are submitted to peer review and submission of two kinds of documents, which are marked with parentheses in the cover of technical documents. The
(two) submitted to the
Railway, state power, transportation, coal, nonferrous metals, etc., have been jointly issued with our ministry to make specific provisions on Soil and water conservation work of the industry project, and the submission of the outline and the report shall be handled according to the original documents. For other construction projects, the requirements are as follows:
1, the outline (manuscript review) and (approval draft) by the construction unit reported to the Ministry of water resources, soil and water conservation division. The
2, the report (Draft) and (approval draft) by the construction unit submitted to the provincial water administration department of the project site transferred to the Ministry of water resources. The
All of the above messages are in three copies. The
(three) the other
1. The construction unit shall send the outline or report to the relevant experts 5 days before the preliminary meeting. The design unit shall make a serious revision according to the opinions made by the experts at the preliminary meeting
To form a report (Draft for approval), first send to the soil and Water Conservation Monitoring Center for examination and approval. The
2, the construction unit shall receive the approval document within 30 days after the report (approval manuscript) to the project l