- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Cleanliness
General
LEP2/MRA April 2009 © MAN Diesel A/S 1
Cleanliness
General
Cleanliness - Flushing procedure
1. In our documents you can find recommendations covering the
preparation, manufacturing and installing of all lubricating and fuel
oil piping for MAN BW Diesel 2-stroke diesel engines and applies
to engine builders, shipyards etc.
2. We recommend to follow our instructions to ensure that the whole
system is absolutely clean before filling with oil and starting up!
In order to avoid problems stemming from rust, scales, welding and impurities in lubricating and fuel oil systems it is
essential that the system pipes are manufacturing, cleaning and treating accordingly.
The detailed procedures have been prepared on basis of many years experience. Large particles, e.g. slag, sand and
steel particles can damage pumps, valves and bearings.
Clean pipes will reduce the flushing period considerably. First it is necessary to understand that flushing is not able to
remove completely particles if the system is very dirty. Flushing removes particles, which is not possible to avoid at
earlier stages and also to check the condition of the system.
If some impurities will remain in the system then, after flushing may cause damage later: due to vibrations of the ship in
service.
LEP2/MRA April 2009 © MAN Diesel A/S 2
Cleanliness
General
Scratches of crosshead pin – open up inspection after sea trial
All engine crankshaft
bearings were heavily
damaged as well as the
crossheads pins had got
many scratches. Of course, all
damaged parts required to be
dismount and send to
workshop and rectify.
Afterwards, inspection of
lubricating oil and system pipes
carried out. Many of hard
particle
原创力文档


文档评论(0)