皮带机施工方案改 英文版 .docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
皮带机施工方案改 英文版

Belt Conveyor Erection Plan CATIC Beijing Co., LTD March 23, 2013 Table of Contents I. Equipment technical parameters II.Construction preparation III.Construction sequence IV.Test run V.Safety technical measures VI.Belt vulcanizing program VII.Equipment erection protocol I. Equipment technical parameter: Equipment No.Equipment ModelPower552BC1DTⅡ B800x36265mm 0°reversible11KW552BC2DTⅡ B800x45405mm 0°reversible15KW552BC3DTⅡ B800x16159mm 12°11KW552BC4DTⅡ B800x10300mm 0°7.5KW552BC5DTⅡ B800x11799mm 8°11KW552BC6DTⅡ B800x11799mm 8°11KW552BC7DTⅡ B1400x12300mm 0°18.5KW552BC8DTⅡ B1400x12300mm 0°18.5KW552BC9DTⅡ B650x6470mm 0°11KW552BCADTⅡ B650x6470mm 0°11KW552BCBDTⅡ B650x14010mm 12°5.5KW552BCCDTⅡ B650x14010mm 12°5.5KWII.Construction preparation: 1. Organize construction personnel study familiar with the drawings, installation manuals and other technical information as well as inform site safety measures. 2. Know equipments delivery situation, site storage location and site conditions; 3. Prepare construction machinery and materials construction power; 4. Check site equipments specifications, size, quantity and quality according to equipment list. III.Construction Sequence 1. Foundation Handover Check equipment foundation vertically and horizontally centerline; bolt hole size, hole depth; elevation. Part of foundation is above steel structure beams, which needs its bolt hole size, position, spacing. Whether meets equipment erection Drawing or not. According to actual situation, most steel structure steel beams related equipment foundation did not match equipment foundation bolt hole. If we conduct construction based on drawing, it will need you side to the corresponding equipment foundation. Our suggestion is based that most steel structure steel beams related equipment foundation did not match equipment foundation bolt hole while all checkered plate has been laid. For belt conveyor erection.We need to cut out the chec

文档评论(0)

yan698698 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档