GeiPilot Techinical Seminar培训课件.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
For Internal Use Only GP Technical Seminar JinNan March 2009 Geo-Pilot Technical Seminar Brief Introduction Pre Job Working After job Special Comments Dinner Brief Introduction Point to bit system Long gauge bit Pre Job – Job Preparation Down Hole Tools GeoPilot PWD MWD FEWD Surface equipment GeoSpan Pluming kit MWD Unit Laptops Software INSITE Compass Planit QQ Pre Job – Bit Selection Anti-balling Less blades 12-1/4” FSF2563 PDC Nozzles: 5X16+2x20 (TFA 1.59) 8-1/2” FMF3553 PDC Nozzles: 3x16+1x14 (0.89) W/restrictor: 3x20+2x18 (1.42)+34/32 Pre Job – Hydraulics Calculation Pressure below PWD: GP9600 needs 450 psi, GP7600 needs 475 psi. Need further testing on fields MWD settings Working Surface settings (INSITE, GeoSpan) M/up BHA SHT and RIH Casing shoe Drilling Soft formation drilling Hard stringer drilling Reporting POOH L/D Working – Surface Settings INSITE GeoSpan Working – M/UP BHA Working – SHT and RIH GP Confidence test Tool Download Oil Status checking Working – Break in the seals Ensure that the Seals are broken in on the GP tool prior to circulation. Rotate at 5rpm for 2 min Rotate at 10rpm for 2 min Rotate at 20rpm for 2 min Rotate at 40rpm for 2 min Rotate at 60 rpm for 2 min REMEMBER: No Pumps when break in seals, normally in Casing 注意: 润滑密封时不开泵,通常在套管里进行 Working - How to drilling Casing shoe? Fill pipe and establish circulating parameters, wash down with good flow one stand before tagging cement or rubber plug. 钻具中灌满泥浆, 建立循环, 然后缓慢下放钻具直至探到水泥塞. If seals haven’t been broken in DO IT. Before Circulation commenced above the cement, ensure that the Seals are broken on the GP tool. No pumping when broken seals. 如果GP的密封没有润滑, 请先GP的密封润滑. 注意: 润滑密封时不开泵. Ensure that the Geo-Pilot is set in the “Zero” deflection position. 确保GP的设置在中性状态. Working - How to drilling Casing shoe? Drill cement, float and shoe track with low weight 40-60 rpm and full flow rate. Once completely satisfied that the plugs have been drilled, WOB may be increased to facilit

文档评论(0)

xingyuxiaxiang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档