Geo-Pilot Class for Field Engineers培训课件.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Development history Joint venture between Sperry-Sun and JNOC (Japan National Oil Corporation). Capitalises on JNOC’s 12 year development of industrial robot technology to build harmonic drive control unit Capitalises on Sperry-Sun’s drilling tools design experience to build working second generation RST in 14 months “Point-the-bit” method allows use of long gauge bits Long gauge bits give both high hole quality and smooth running (which is vital for reliability) Communicating with GeoPilot Manual method: “demonstrate” toolface to GeoPilot as an off bottom MWD toolface and “tell” GeoPilot to align itself. Closed loop maintenance of toolface until instructed otherwise. Communication via pumps and rotary on/off. Downlink method: pulse the required toolface and deflection to GeoPilot from surface. Downlink tested May 2000, installation complete Q3/4 2000 Fully compatible with Insite? - Real Time Ops, 3D viz Communication Sequence (Manual) Putting Geo-Pilot? on Catwalk Geo-Pilot? POOH, Filling Tool Environmental Specifications Max Temperature: 140°C Max Pressure: 18,000 psi Max Vibration: 20 g rms 5-500 Hz Mud limitations: None LCM limitations: None Mechanical specifications Max Weight On Bit: 55,000 lb.f Max Torque: 20,000 ft.lbs Max Overpull 275,000 lbs Ultimate Overpull 575,000 lbs Max RPM: 250 Length 20’ Sensor Points ABI is 3’ from bottom of tool. Sensor Accuracy +/- 0.1° @ 2? (Rotation Off Condition While Surveying). System Accuracy +/- 0.3 @ 2? All other FEWD sensors go above tool and sensor points are standard spacing from top of flex collar. * Geo-Pilot Geo-Span Training course for field engineers Overview Rig Up Pressure Test, Function Test Electronic Test Technical Specifications Software Field operations Nozzle Change procedures Part 1: Geo-Span Downlink System 2 Geo-Span Control Panel View 2 Filter Delta P Gauge Manual Control Handle Lock-out Valve Handles Air Regulator Knob Controlled Air Gauge Geo-Span Inlet/Ou

文档评论(0)

xingyuxiaxiang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档