朱家庄住宅区改造工程项目投资风险管理研究 报告.docVIP

朱家庄住宅区改造工程项目投资风险管理研究 报告.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
朱家庄住宅区改造工程项目投资风险管理研究 报告

朱家庄住宅区改造工程项目投资风险管理研究 摘 要 Research on the risk management of ZHUJIAZHUANG residential renovation project Abstract Since the economic crisis, a growing awareness of risk, and risk management, and more attention. Engineering construction process, often will be affected by many factors, affecting the normal progress, even bring certain economic and security issues, must be correct and effective risk management, to ensure the project smoothly. Residential project with large investment, long cycle, the characteristics of the complex construction technology, compared with the general engineering, has a more uncertain risk factors, and lead to harm. Therefore, in the residential are increasing and risk management under the background of more and more attention, residential engineering project risk management must be effectively implemented, it can be said that the risk management of residential project, it is urgent, is imperative. This paper introduces the project management on the basis of relevant theories, with Zhu Guzhuang residential renovation project as an example of project risk management research based on the analysis put forward to be the main problem in the process of the project risk management and preparation, and sums up four types of risk from different angles, including the project schedule risk, quality risk, cost, risk and security risks, and further to determine the risk index, and through the analytic hierarchy process (ahp) to set the primary indicators and secondary indicators of risk assessment, risk response measures are put forward, hope for better to complete the project, as well as the relevant domestic enterprises provide certain basis for project risk management. Keywords:project risk management, home improvement, risk assessment 摘 要 4 Abstract 5 Keywords 5 0引言 1 0.1研究背景 1 0.1.1工程项目风险管理背景 1 0.1.2住宅区工程项目风险管理国内外研究现状 1 0.1.3朱家庄住宅区改造工程项目建设背景 6 0.2研究意义 7 0.3研究的主要内容 7 1工程项目风险管理理论 8 1.1工程项目风险概述 8 1.1.1风险的定义 8 1.1.2住宅工程项目风险的分类 8 1.1.3住宅工程项目风险的特征 1

文档评论(0)

pengyou2017 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档