- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Project Management Practices Rev E, June 2003
U.S. Department of Energy
Office of Management, Budget and Evaluation
Work Breakdown
Structure
Initiated by: Office of Engineering and Construction Management
WORK BREAKDOWN STRUCTURE
A project work breakdown structure (WBS) is a deliverable or product-oriented grouping of
project work elements shown in graphical display to organize and subdivide the total work
scope of a project.
The WBS is a particularly important project tool. Considerable thought and planning should
be given to its development and implementation so that subsequent changes are minimized.
Major revisions to a WBS require both substantial effort and resources, due to its application
to a wide array of project activities. Project WBSs, which are driven by the scope of a
project, should not be confused with other uses of WBS -like systems. MIL-HDBK-881 is
the accepted standard on WBS.
1.0 WBS DEVELOPMENT
A WBS is the cornerstone of effective project planning, execution, controlling, statusing,
and reporting. All the work contained within the WBS is to be identified, estimated,
scheduled, and budgeted. The WBS is the structure and code that integrates and relates all
project work (scope, schedule, and cost). Therefore, the WBS contains the project’s scope
baseline necessary to achieve the technical objectives of the work described. The WBS is
used as a management tool throughout the life cycle of a project to identify, assign, and
track its total work scope. When initial project funding is received, the Project Director (PD)
develops a WBS that identifies necessary funds according to the schedule and needs of the
tasks in the WBS elements. The WBS is