土木工程英语UnitStructualelements结构构件.pptVIP

土木工程英语UnitStructualelements结构构件.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土木工程英语UnitStructualelements结构构件

Words and expressions 1. combination 2. truss 3. arch 4. girder 5. skeleton 6. timber 7. reinforced concrete 8. timber structure 9. wall bearing construction 10. suspended structure Questions 1. Does “wall bearing construction” mean that it only keeps out the weather? If not, what does it mean? 2. What does skeleton construction mean? 3. What kind of construction is used for a building of one hundred storeys high? Translation Bearing walls have to carry the weight of the building. That means that the walls of the building on the lower floors have to be very thick. With skeleton-frame construction, walls don’t support the building. Their main function is to keep wind and rain out of the building. * * * * Unit 6 Structural Elements 结构构件 Leading in Dialogue Text Exercises Teaching Steps Pictures to the Dialogue Steel Structure Roof Bolts and Connection Molds Truss The Erection of Steel Structure Key Words and Phrases: fabrication erection column beam adopt 6. accuracy 7. steel structure 8. step by step 9. high strength 10. erection error shop drawing design drawing Dialogue A: The structure is a very important part of the works. Now let’s go and have a close look at the fabrication of the steel structure step by step, OK? B: That’s good. Let’s have a look at the erection of the steel structure. The principle sequence of erection works is from low level to high level, from column to beam, from the main beam to secondary beams and from center to outer sides. A: All columns and beams are connected by high strength bolts. It’s not allowed to have a single bolt to be fixed by over force. How can you manage it? B: During the fabrication of the steel structure we adopt high accuracy for connection molds in which the sizes and position of the holes are controlled below 25% the tolerance of the specification, which allows a limitation of erection error. A: Are all the molds made in the same fa

文档评论(0)

2105194781 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档