- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文文献翻译
()
英文原文 Mine scraper conveyor soft-start mode of selection and application
High yield and high efficiency in the coal mine fully mechanized coal face of the building, to face big-long, large to support the requirements of the power of Shearer and scraper conveyor. Ordinary fully mechanized coal face of the long-general in about 150 m, scraper conveyor transport capacity of 500 t / h around high yield and high efficiency and fully mechanized coal face of the long-General to 180 ~ 300 m, scraper conveyor transport capacity of 800 t / h and above, therefore, conveyor power greater growth. Pingdingshan Coal Mining Group Company to as an example, the scraper conveyor of power in most 400 (2 × 200) kW and above, the largest for the 750 (2 × 375) kW. Scraper conveyor to the start-up launched mainly two-speed, limited by a small number of filling hydraulic coupler, which started two kinds of ways, not only operating costs, and it stands high. Therefore, the need to seek new technology and equipment to meet the requirements of high yield and high efficiency.
一 、 current situation and existing problems
(一 ) limit filling hydraulic coupler in the high-power, big load, its size, when it with the motor and reducer connection, the greater the share of space. Limited space in the work of the occasion, too much volume will scraper conveyor layout difficult. Coupled with increased hydraulic transmission distance and high-speed rotating state and easy to have a greater impact on the radial dynamic load, and the slowdown caused by electrical installations damaged. Coupled with the input and output speed than the speed of usually no more than 97 percent, that is impossible to achieve input shaft and output shaft of sync, which must exist greater power loss, reducing the efficiency of the transmission system.
(二 ) two-speed motor drive system is currently in Chinas mining scraper conveyor in common. Under normal circumstances, the rated speed motor to start the half, correspond
您可能关注的文档
- 汽车防盗报警器外文文献翻译中英文.doc
- 数据库管理系统外文文献翻译中英文.doc
- 公路线形设计外文文献翻译英文参考.doc
- 工程管理外文文献翻译混凝土施工.doc
- 二手物品交易网站外文文献翻译中英文.doc
- 网页设计与制作外文翻译文献中英文.doc
- 数控机床与原理外文文献翻译中英文.doc
- 变电站建设外文文献翻译中英文.doc
- 施工组织设计外文文献翻译中英文.doc
- SBS改性沥青外文翻译文献.doc
- 法律硕士联考专业基础课(非法学)-21-2 .pdf
- 泰豪集团有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版完整版.docx
- 2024国培计划个人研修计划(6篇) .pdf
- 2024年陕西省宝鸡市公开招聘警务辅助人员辅警笔试自考练习卷一含.pdf
- 精选最新版2020年大学期末思想道德修养与法律基础完整考题库(含.pdf
- 2024年浙江省嘉兴市公开招聘警务辅助人员辅警笔试模拟自测题A卷含答.pdf
- 瑞西光华佳苑总包施工招标1204(定稿).doc
- 职业健康与防护详细讲解培训课件(11.1).doc
- 都溪河综合治理项目部月度报告(7月份 ) .doc
- 湖北恒大建设工程有限公司简介1.doc
最近下载
- 2021年香薰服务合同.docx
- 《Python与数据分析应用》课件——第10章 数据分析工具Pandas.pptx VIP
- 战争狂人希特勒简介.ppt
- 家庭教育指导师试题库.doc
- -司法鉴定人执业能力评估业务理论知识考试题库(司法鉴定人考试试题及答案解析)-.docx VIP
- 病房急产应急预案演练脚本.docx VIP
- 生产项目准入及预算标准第六册主网修理项目准入及预算标准(预算分册).docx
- 2025新人教版语文七年级下册《第一单元》大单元整体教学设计[2022课标].pdf
- 电子商务文案创意与撰写:直播脚本编写PPT教学课件.pptx
- (高清版)-B-T 30146-2023 安全与韧性 业务连续性管理体系 要求.pdf VIP
文档评论(0)