- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
石油工程英语artIBeforedrillingcanbegin
Lesson 3Before Drilling Can Begin 3.1 Mapping—Leasing—Permitting Before one can begin to drill for oil one must Know exactly where to locate the drill rig, and be able to describe that location in precise legal terms; Obtain permission to drill for, and to produce hydrocarbons from the owners of both the surface of the land and the minerals; Obtain the proper permits from a myriad of government agencies. Lesson 3Before Drilling Can Begin 3.2 Mapping 3.2.1 Land Measurement Correct legal descriptions of a piece of land are vital to the sale, purchase, mortgaging, and leasing of land. Accurately plot proposed well locations, and legally describe land ownership, one must have a system of land measurement, which should meets these criteria: highly accurate, and relatively easy to work with. The system used in the United States is the rectangular survey system, the result of a land ordinance passed by Congress in 1785, Not included in the survey were the 13 former British colonies plus Maine, Kentucky, Tennessee, and later, Texas, which still measure land by “metes and bounds.” Lesson 3Before Drilling Can Begin 3.2 Mapping 3.2.1 Land Measurement The establishment of a principal meridian and a base line (Figure 3.1). These principal meridians run in a true north-south direction; The base lines run east and west at right angles to the meridians. The point at which the two lines intersect is called the initial point or starting point. Meridians are named with a notation that names the meridian involved, i.e., “I.M.” or, “Indian Meridian”. Lesson 3Before Drilling Can Begin 3.2 Mapping 3.2.2 Townships The legal description of a tract of land is based on a Congressional township, which is an area 6 mi square, and contains 36 mi2. This is 3 steps to make a Congressional township. lay out the principal meridian and base lines; The surveyor returns to the starting point and lays out lines north and south every 6 mi on either side of the meridian; He lays out
您可能关注的文档
- 现金流管理理财建议书.doc
- 现代碳酸盐沉积环境.ppt
- 现代采购与供应管理概述.ppt
- 班组长沟通协调.doc
- 现代钻井及油气井工程基本概念发展现状及趋势.pdf
- 理念引领创优服务立足于银行转型需求扎实推进规范服.doc
- 理科类专业毕业设计论文格式模板.doc
- 理科综合模拟试题化学部分.doc
- 理综全国卷.doc
- 理综全国卷二.doc
- 石油工程设计大赛赛题分析采油方案.ppt
- 石油工程设计大赛赛题分析开发方案油藏.ppt
- 石油工程专业英语采油技术基础roductiontechnology.doc
- 石油工程专业英语钻井技术基础BasicDrillingtechnology.ppt
- 石油工程钻井钻柱力学最大延伸长度lmax与疲劳破坏.ppt
- 石油工程钻井钻柱力学第二章钻柱设计与负荷计算节.ppt
- 石油工程设计大赛赛题分析钻井完井工程.ppt
- 石油工程钻井钻柱力学第五章钻柱一般设计方法与螺弯受力.ppt
- 石油工程钻井钻柱力学第二章钻柱设计与负荷计算节遇阻卡受力与卡点深度计算.ppt
- 石油工程钻井钻柱力学第四章钻柱螺旋弯曲基本概念.ppt
原创力文档


文档评论(0)