- 13
- 0
- 约3.81万字
- 约 53页
- 2018-05-07 发布于福建
- 举报
美国pmi的项目管理
Developing a Mission, Vision, Goals, and Objectives * Objectives need to be SMART Specific Measurable Attainable Realistic Time-Limited * Mission Statement To answer two questions: What are we going to do? For whom are we going to do it. Talk to customers to verify the mission statement. * Work Breakdown Structure (WBS) Subdivide a complicated task into smaller tasks. With smaller tasks, it’s easier to estimate the time and cost. Using WBS to plan for what is vital. Typical WBS has 3 – 6 levels. Sequence is not concerned. Need to capture all the tasks. WBS is a good way to portray the scope of a project. * Estimating Time, Costs and Resources Parkinson’s law: Work expands to fill the time allowed. Be careful not to penalize workers who perform better than expected by loading them down w/ excessive work. One of the primary causes of project failures is that ballpark estimates become targets. Use consensual estimating. * Scheduling Project Work * CPM PERT CPM- Critical Path Method PERT – Program Evaluation and Review Techniques. PERT calculate the probability that an activity will be completed by certain time. Network diagrams allow an easier assessment of the impact of a slip on a project than is possible with Gantt charts. * Rules of Scheduling a Project Don’t schedule in more detail than you can manage. No task should have a duration much greater than 4 – 6 weeks. Schedules should be developed according to what is logically possible, and resource allocation should be done later. This will yield the optimum schedule. Keep all times in the same increment. * Project Control and Evaluation * Key Points to Remember Compare progress to plan - action can be taken to correct for deviations. Project is in control is only when all team members are in control. The effort used to control a project should be worthwhile. Record project working time daily. Project evaluation is done to determine whether a project should continue or be canceled. * Project Control Using E
您可能关注的文档
- 精益生产诊断的结果汇报.ppt
- 精益生产诊断的结果的报告.ppt
- 精益改善推进的报告ppt.ppt
- 精美背景的设计ppt模板.ppt
- 系统分析的方法.ppt
- 精益生产诊断的结果汇报PPT 335-.ppt
- 系统的设计.ppt.ppt
- 糖业行业的研究的工作体会.ppt
- 精美工作的报告ppt模板.ppt
- 系统工程系统科学的方法论与系统.ppt
- 小区绿化施工协议书.docx
- 墙面施工协议书.docx
- 1 古诗二首(课件)--2025-2026学年统编版语文二年级下册.pptx
- (2026春新版)部编版八年级道德与法治下册《3.1《公民基本权利》PPT课件.pptx
- (2026春新版)部编版八年级道德与法治下册《4.3《依法履行义务》PPT课件.pptx
- (2026春新版)部编版八年级道德与法治下册《6.2《按劳分配为主体、多种分配方式并存》PPT课件.pptx
- (2026春新版)部编版八年级道德与法治下册《6.1《公有制为主体、多种所有制经济共同发展》PPT课件.pptx
- 初三教学管理交流发言稿.docx
- 小学生课外阅读总结.docx
- 餐饮门店夜经济运营的社会责任报告(夜间贡献)撰写流程试题库及答案.doc
原创力文档

文档评论(0)