国际会议报告英文ppt-面向造船过程的动态生产计划管理系统研究.ppt

国际会议报告英文ppt-面向造船过程的动态生产计划管理系统研究.ppt

  1. 1、本文档共30页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国际会议报告英文ppt-面向造船过程的动态生产计划管理系统研究.ppt

Study on Dynamic Production Planning System Oriented to the Shipbuilding Process Contents Introduction Problems in modern shipbuilding approach 1 Introduction Problems in modern shipbuilding approach 1.1 Problems in shipbuilding Uncertainties Scheduling for shop-floor and spatial block scheduling Subassembly production Process planning (T. Amemiya; Nakayamma) 1.1 Problems in shipbuilding Lean manufacturing Japanese??shipbuilders were developing some of the lean principles at the same time as Toyota 1.1 Problems in shipbuilding Integrated scheduling system (LEE 1997) Constraint directed graph search Spatial scheduling Dynamic assembly line scheduling Neural network based man-hours estimation 1.2 Problems in MODERN shipbuilding The shipbuilding orders tend to call for several ships?with?similar?designs. As many as 14 ships in the same series have been ordered from DSIC and will be delivered in 5 years. 2 Dynamic Production Planning System 2.1 Critical concepts 2.2 System solution 2.1 Critical concepts ShipType(… Propertyi …) 2.1 Critical concepts The Prototype for a Project Plan 2.1 Critical concepts Parts of project plan 2.2 System solution 3 Algorithms 3.1 Physical Distribution Algorithm 3.2 Simplified Simulated Annealing Algorithm 3.1 Physical Distribution Algorithm The Physical Distribution means: material distribution workload plan 3.1 Physical Distribution Algorithm The main material quantity M for an Item can be distributed with the following probability distribution: 3.1 Physical Distribution Algorithm 3.1 Physical Distribution Algorithm The First Result: 3.1 Physical Distribution Algorithm 3.1 Physical Distribution Algorithm 3.2 Simplified Simulated Annealing Algorithm Objective Function 3.2 Simplified Simulated Annealing Algorithm 3.2 Simplified Simulated Annealing Algorithm 3.2 Simplified Simulated Annealing Algorithm 4 Conclusion The dynamic production planning system optimizes triennium tolling production pl

文档评论(0)

zhangningclb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档