- 1、本文档共48页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* Capacitor: low-energy/high-power application Low-speed flywheels: high-energy/low-power application * Threshold control: BCHP operates whenever the electrical load is greater than a predetermined threshold Buyback priority: sell back power to utility Cooling priority Heating priority Optimal control * Three causes for concern with regard to whether a combined grid-DG system will truly deliver high reliability. Running the DG unit “in parallel” with the grid requires close monitoring of the grid, the DG, and the owner’s demand, with precise control of the DG unit and its grid interconnection at all times. Reliability problems from other places in the grid, far from the DG site, can cause operating problems for the DG unit. Unexpected events on the utility system can disturb the DG unit, often causing it to shut down, particularly if it has very sensitive control or protection equipment. * In parallel operation, the DG and the grid are both always connected to the load, and hence to each other. The grid will instantaneously make up the difference if the DG fails suddenly. Similarly, the DG will pick up the load instantly if the grid source suddenly fails, and again there is no interruption of power. In roll-over operation, if the DG fails while it is supplying the load, either a human being or an automatic sensor, has to operate two switches, the first to disconnect the DG from the load, the second to roll the load over to the grid by connecting the load to it. The opposite switching sequence occurs if the grid is connected to the load and the DG is on standby. * 2 to 3 kW * Ejector: Desulfurized natural gas is fed directly into an ejector (also known as a jet pump). The ejector creates a partial vacuum that pulls spent fuel from a recirculation plenum near the top of the stack. This captures water vapor needed for the reforming of the natural gas. Pre-reformer: This fuel mixture passes over a catalyst (the pre-reformer) where any higher hydrocarbons are co
您可能关注的文档
- 新生儿(二).ppt
- 第七章 网络诱骗系统.ppt
- 第8章 计算机网络基础知识及Internet应用.ppt
- 艺术概论 - 第九章.ppt
- 第五章劳动保护.ppt
- 高三数学补充试题.ppt
- 创建一个企业的电子商务.ppt
- 市场营销Chap3.ppt
- 复件 定语从句.ppt
- 第14章 铣削与铣刀.ppt
- 剧本杀行业报告:内容创作规范与剧本市场拓展策略.docx
- 剧本杀行业区域市场区域文化特色与市场潜力分析报告.docx
- 剧本杀行业区域市场拓展实战案例研究.docx
- 剧本杀行业区域市场拓展路径与模式探索报告.docx
- 剧本杀行业区域市场竞争态势与品牌差异化策略研究报告.docx
- 剧本杀行业2025年西北区域市场市场细分领域竞争态势与品牌竞争策略分析研究报告.docx
- 剧本杀行业2025年西北市场拓展前景预测报告.docx
- 剧本杀行业2025年长沙市场发展潜力分析报告.docx
- 剧本杀行业2025年长三角市场竞争策略与布局分析.docx
- 医疗行业数据合规:2025年数据安全法实施后的合规监管挑战与应对.docx
最近下载
- 电气安全评估报告模板.docx VIP
- 2025学年人教版英语七年级下册单词默写表.docx VIP
- TB 10754-2018 高速铁路轨道工程施工质量验收标准 含2023修改单(2-2).pdf
- 《网络工程师》模拟考试题.doc VIP
- 脑梗塞中医辨证课件.pptx
- 解码国家安全智慧树知到期末考试答案章节答案2024年国际关系学院.docx VIP
- YB∕T 5305-2020 线缆套管用焊接钢管(可复制版).pdf
- 应用指南《GB_T23443-2024建筑装饰用铝单板》应用指南.pptx VIP
- CQC3703-2022 绿色能源消费评价技术规范-活动.pdf VIP
- 1.4 全面推进依法治国的六项重大任务(政策与法律法规 第五版).pptx VIP
文档评论(0)