基于产权结构和政府监管的ppp项目治理机制分析-analysis of ppp project governance mechanism based on property right structure and government supervision.docxVIP
- 9
- 0
- 约4.58万字
- 约 51页
- 2018-05-18 发布于上海
- 举报
基于产权结构和政府监管的ppp项目治理机制分析-analysis of ppp project governance mechanism based on property right structure and government supervision
restrict private sector’s self-interest investment.Considering PPP project government regulation, the research summarizes government regulation problems of PPP projects in China and put forward political proposals to improve PPP regulation framework. This research then builds regulatory mechanism from three aspects including market entry and exit, project implementation, and pricing of product or service, and designs the pricing mechanism using principal-agent theory. Measures to solve information asymmetry in PPP projects include the use of screening methods to solve adverse selection problems and the application of incentive contract to solve moral risk problems.KEY WORDS:Public-Private Partnerships, Governance Mechanism, Property Rights Structure, Government Regulation目录第一章 绪论............................................................................................................. 11.1 研究背景................................................................................................................ 11.2 研究意义................................................................................................................ 21.3 PPP 项目国内外研究现状21.3.1 PPP 项目契约视角研究现状31.3.2 PPP 项目规制与激励视角研究现状31.4 研究内容................................................................................................................ 41.5 研究方法和主要创新点......................................................................................... 51.5.1 研究方法 ..................................................................................................... 51.5.2 技术路线图.................................................................................................. 6 第二章 PPP 项目治理理论基础与治理框架的构建............................................... 8 2.1 PPP 模式概述 ......................................................................................................... 8PPP 项目特征8PPP 模式分类92.1.3 PPP 项目公私双方合作机理 102.2 理论基础...........................................................................................
您可能关注的文档
- 基于贝叶斯理论的钢筋混凝土梁柱中节点抗剪强度分析-shear strength analysis of joints in reinforced concrete beams and columns based on bayesian theory.docx
- 基于贝叶斯理论的投标决策分析-analysis of bidding decision based on bayesian theory.docx
- 基于贝叶斯理论的网页木马检测技术分析-analysis of webpage trojan detection technology based on bayesian theory.docx
- 基于贝叶斯理论的人脸识别算法的分析-analysis of face recognition algorithm based on bayesian theory.docx
- 基于贝叶斯理论的运动目标跟踪技术分析-analysis of moving object tracking technology based on bayesian theory.docx
- 基于贝叶斯理论的运动目标检测算法分析-analysis of moving object detection algorithm based on bayesian theory.docx
- 基于贝叶斯网络的可靠性概率风险评价方法分析-analysis of reliability probability risk assessment method based on bayesian network.docx
- 基于贝叶斯网络的地铁项目施工风险评价分析-analysis of subway project construction risk assessment based on bayesian network.docx
- 基于贝叶斯网络的跨流域调水工程水文风险分析分析-hydrological risk analysis of inter-basin water transfer project based on bayesian network.docx
- 基于贝叶斯网权限图的网络安全评估方法分析-analysis of network security evaluation method based on bayesian network permission map.docx
- GB/T 42818.2-2026认知无障碍 第2部分:报告.pdf
- 中国国家标准 GB/T 47116-2026地下采矿机械 工作面移动式采掘机械 采煤机和犁式系统的安全要求.pdf
- 《GB/T 47116-2026地下采矿机械 工作面移动式采掘机械 采煤机和犁式系统的安全要求》.pdf
- 中国国家标准 GB/T 42818.2-2026认知无障碍 第2部分:报告.pdf
- 《GB/T 42818.2-2026认知无障碍 第2部分:报告》.pdf
- 《GB/T 27664.1-2026无损检测仪器 超声检测设备的性能与检验 第1部分:仪器》.pdf
- 中国国家标准 GB/T 27664.1-2026无损检测仪器 超声检测设备的性能与检验 第1部分:仪器.pdf
- GB/T 27664.1-2026无损检测仪器 超声检测设备的性能与检验 第1部分:仪器.pdf
- GB/T 45305.5-2026声学 建筑构件隔声的实验室测量 第5部分:测试设施和设备的要求.pdf
- 中国国家标准 GB/T 45305.5-2026声学 建筑构件隔声的实验室测量 第5部分:测试设施和设备的要求.pdf
原创力文档

文档评论(0)