酒店类建筑混合式地源热泵系统间歇运行分析-intermittent operation analysis of hybrid ground source heat pump system in hotel buildings.docxVIP

  • 2
  • 0
  • 约4.03万字
  • 约 59页
  • 2018-05-29 发布于上海
  • 举报

酒店类建筑混合式地源热泵系统间歇运行分析-intermittent operation analysis of hybrid ground source heat pump system in hotel buildings.docx

酒店类建筑混合式地源热泵系统间歇运行分析-intermittent operation analysis of hybrid ground source heat pump system in hotel buildings

华中科技大学硕士学位论 华 中 科 技 大 学 硕 士 学 位 论 文 II II Abstract Heat transfer process of the underground heat exchanger of ground source heat pump system with the surrounding soil is non-steady-state,soil temperature will constant chang with the unit running,remove and the release of the heat . In the region with hot summer and cold winter, summer accumulated row heat is much larger than the winter accumulated take heat,the running of the heat pump unit of the hotel buildings continuously sustained exothermic to the soil, will cause the circulating water temperature of the underground heat exchang

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档